Automatic Transmission Assembly (For 1Vd-Ftv) Installation
Drivetrain. Land Cruiser. Urj200, 202 Grj200 Vdj200
INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY
INSTALL TRANSFER ASSEMBLY
INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
INSTALL TRANSMISSION HOUSING COVER
INSTALL OIL PAN COVER
CONNECT WIRE HARNESS AND CONNECTOR
CONNECT BREATHER PLUG HOSE
INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR
INSTALL NO. 2 FRAME CROSSMEMBER SUB-ASSEMBLY
CONNECT OIL COOLER TUBE
INSTALL DRIVE PLATE AND TORQUE CONVERTER CLUTCH SETTING BOLT
INSTALL EXHAUST PIPE (w/ DPF)
INSTALL EXHAUST PIPE (w/o DPF)
INSTALL PROPELLER SHAFT ASSEMBLY
INSTALL FRONT PROPELLER SHAFT ASSEMBLY
CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
ADD AUTOMATIC TRANSMISSION FLUID
INSPECT SHIFT LEVER POSITION
INSPECT FOR EXHAUST GAS LEAK
INSTALL OIL PAN PROTECTOR ASSEMBLY
INSTALL FRONT FENDER APRON TRIM PACKING C
INSTALL FRONT FENDER APRON TRIM PACKING A
INSTALL NO. 2 ENGINE UNDER COVER
INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
RESET MEMORY
Automatic Transmission Assembly (For 1Vd-Ftv) -- Installation |
1. INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY |
Using a vernier caliper and straightedge, measure dimension A between the end of the engine and the torque converter contact surface of the drive plate.
Install the torque converter to the transmission housing.
Using a vernier caliper and straightedge, measure dimension B shown in the illustration and check that B is more than A measured in the first step.
- Standard distance:
- B = A + 1.00 mm (0.0394 in.) or more
2. INSTALL TRANSFER ASSEMBLY |
Install the transfer with the 8 bolts.
- Torque:
- 40 N*m{408 kgf*cm, 30 ft.*lbf}
- NOTICE:
- Be careful not to damage the oil seal of the transfer adapter.
Install the transfer case lower protector with the 7 bolts.
- Torque:
- 14 N*m{143 kgf*cm, 10 ft.*lbf}
Connect the clamp of the ground cable to the transfer case lower protector.
3. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY |
- NOTICE:
- Check that the 2 straight pins are attached to the engine side.
Install the transmission with the 10 bolts.
- Torque:
- for 17 mm head bolt A:
- 71 N*m{724 kgf*cm, 52 ft.*lbf}
- for 14 mm head bolt B:
- 37 N*m{377 kgf*cm, 27 ft.*lbf}
4. INSTALL TRANSMISSION HOUSING COVER |
Install the transmission housing cover with the 3 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Install the oil pan cover with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
6. CONNECT WIRE HARNESS AND CONNECTOR |
Connect the park/neutral position switch connector, 2 transmission wire connectors, 2 speed sensor connectors and 2 or 3 transfer control side connectors.
- HINT:
- Push up the lever until the claw of the transmission wire connector makes a connection sound.
Connect the 8 harness clamps.
Connect the wire harness with the 2 bolts.
- Torque:
- 8.0 N*m{82 kgf*cm, 71 in.*lbf}
Tilt up the automatic transmission.
Connect the ground cable with the bolt.
- Torque:
- 8.4 N*m{86 kgf*cm, 74 in.*lbf}
7. CONNECT BREATHER PLUG HOSE |
Connect the 3 breather plug hoses to the wire harness.
8. INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR |
Install the rear engine mounting insulator to the transmission with the 4 bolts.
- Torque:
- 59 N*m{602 kgf*cm, 44 ft.*lbf}
9. INSTALL NO. 2 FRAME CROSSMEMBER SUB-ASSEMBLY |
Install the frame crossmember to the rear engine mounting insulator with the 4 bolts.
- Torque:
- 37 N*m{377 kgf*cm, 27 ft.*lbf}
Install the frame crossmember to the frame with the 4 bolts and 4 nuts.
- Torque:
- 110 N*m{1122 kgf*cm, 81 ft.*lbf}
Install the engine mounting hole cover.
10. CONNECT OIL COOLER TUBE |
Connect the 2 transmission oil cooler hoses as shown in the illustration.
Text in Illustration*a
| Paint Mark
|
*b
| RH Side
|
- NOTICE:
- Make sure the pinching portion of each clip is facing the direction shown in the illustration.
- Make sure the paint mark of each hose is facing outward.
Temporarily install the oil cooler tube to the engine with the bolts A and B. Install the bolt C and tighten it to the specified torque. Then tighten the bolts A and B to the specified torque.
- Torque:
- 14 N*m{143 kgf*cm, 10 ft.*lbf}
11. INSTALL DRIVE PLATE AND TORQUE CONVERTER CLUTCH SETTING BOLT |
Turn the crankshaft to gain access to the installation locations of the 6 bolts and install the bolts while holding the crankshaft pulley set bolt with a wrench.
- Torque:
- 53 N*m{540 kgf*cm, 39 ft.*lbf}
- NOTICE:
- First install the black colored bolt and then install the remaining 5 bolts.
Install the oil pan insulator with the 2 bolts.
- Torque:
- 21 N*m{214 kgf*cm, 15 ft.*lbf}
12. INSTALL EXHAUST PIPE (w/ DPF) |
(Click here)
13. INSTALL EXHAUST PIPE (w/o DPF) |
(Click here)
14. INSTALL PROPELLER SHAFT ASSEMBLY |
(Click here)
15. INSTALL FRONT PROPELLER SHAFT ASSEMBLY |
(Click here)
16. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY |
Connect the gear shifting rod to the transmission control shaft lever RH with the pin and a new clip.
17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
18. ADD AUTOMATIC TRANSMISSION FLUID |
(Click here)
19. INSPECT SHIFT LEVER POSITION |
When moving the shift lever from P to R with the ignition switch ON and the brake pedal depressed, make sure that it moves smoothly and correctly into position.
Check that the shift lever does not stop when moving the shift lever from R to P, and check that the shift lever does not stick when moving the shift lever from D to S.
Start the engine and make sure that the vehicle moves forward after moving the shift lever from N to D and moves rearward after moving the shift lever to R.
If there are problems during the above inspections, perform the adjustment using the following procedures.
Move the shift lever to N
Loosen the nut of the floor shift gear shifting rod. Then, with the lever of the floor shift assembly lightly pushed towards the rear of the vehicle, tighten the nut.
- Torque:
- 13 N*m{130 kgf*cm, 9 ft.*lbf}
20. INSPECT FOR EXHAUST GAS LEAK |
21. INSTALL OIL PAN PROTECTOR ASSEMBLY |
Install the oil pan protector with the 4 bolts.
- Torque:
- 63 N*m{642 kgf*cm, 46 ft.*lbf}
22. INSTALL FRONT FENDER APRON TRIM PACKING C |
Install the front fender apron seal rear RH with the 4 clips.
23. INSTALL FRONT FENDER APRON TRIM PACKING A |
Install the front fender apron seal front RH with the 3 clips.
24. INSTALL NO. 2 ENGINE UNDER COVER |
Install the No. 2 engine under cover with the 2 bolts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
25. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
Install the No. 1 engine under cover with the 10 bolts.
- Torque:
- 29 N*m{296 kgf*cm, 21 ft.*lbf}
26. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH |
Push in the clip to install the front fender splash shield sub-assembly LH.
Install the 3 bolts and screw.
27. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH |
Push in the clip to install the front fender splash shield sub-assembly RH.
Install the 3 bolts and 2 screws.
for w/ DPF (Click here)for w/o DPF (Click here)