Valve Body Assembly Installation
Drivetrain. Land Cruiser. Urj200, 202 Grj200 Vdj200
INSTALL CHECK BALL BODY
INSTALL TRANSMISSION VALVE BODY ASSEMBLY
CONNECT TRANSMISSION WIRE
RESET MEMORY
Valve Body Assembly -- Installation |
1. INSTALL CHECK BALL BODY |
Install the spring and check ball body.
Text in Illustration*1
| Check Ball Body
|
*2
| Spring
|
2. INSTALL TRANSMISSION VALVE BODY ASSEMBLY |
Insert the pin of the manual valve into the hole of the manual valve lever.
Text in Illustration*1
| Pin
|
Install the 19 bolts.
- Torque:
- 11 N*m{112 kgf*cm, 8 ft.*lbf}
- HINT:
- Each bolt length is indicated below.
- 36 mm (1.42 in.) for bolt A
- 25 mm (0.984 in.) for bolt B
- 45 mm (1.77 in.) for bolt C
- 50 mm (1.97 in.) for bolt D
Install the detent spring and detent spring cover with the bolt.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
3. CONNECT TRANSMISSION WIRE |
(Click here)
for 1UR-FE: (Click here)for 1VD-FTV: (Click here)