Exhaust Manifold Installation

Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Ur-Fe Intake Exhaust. Land Cruiser. Urj200, 202 Grj200 Vdj200

  1. INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)

  2. INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1)

  3. INSTALL EXHAUST MANIFOLD ASSEMBLY RH

  4. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

  5. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

  6. INSTALL MANIFOLD STAY

  7. INSTALL EXHAUST MANIFOLD ASSEMBLY LH

  8. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR

  9. INSTALL NO. 2 MANIFOLD STAY

  10. INSTALL PROPELLER SHAFT HEAT INSULATOR

  11. INSTALL FRONT PROPELLER SHAFT ASSEMBLY

  12. INSTALL FRONT EXHAUST PIPE ASSEMBLY

  13. INSPECT FOR EXHAUST GAS LEAK

  14. INSTALL FRONT FENDER APRON TRIM PACKING C

  15. INSTALL FRONT FENDER APRON TRIM PACKING A

  16. INSTALL FRONT FENDER APRON TRIM PACKING D

  17. INSTALL FRONT FENDER APRON TRIM PACKING B

  18. INSTALL NO. 2 ENGINE UNDER COVER

  19. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

  20. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

  21. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

  22. INSTALL AIR CLEANER AND HOSE

  23. INSTALL V-BANK COVER SUB-ASSEMBLY

Exhaust Manifold -- Installation



1. INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)
  1. Temporarily install the air fuel ratio sensor to the exhaust manifold LH by hand.



    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
  1. Using SST, tighten the air fuel ratio sensor.

    SST
    09224-00010
    Torque:
    without SST:
    44 N*m{449 kgf*cm, 32 ft.*lbf}
    with SST:
    40 N*m{408 kgf*cm, 30 ft.*lbf}
    Text in Illustration
    *1
    Fulcrum Length
    HINT:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.8 in.). When using a torque wrench with a fulcrum length that is not 300 mm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (Click here).
    2. Make sure SST and the wrench are connected in a straight line.


2. INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1)
  1. Temporarily install the air fuel ratio sensor to the exhaust manifold RH by hand.



    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
  1. Using SST, tighten the air fuel ratio sensor.

    SST
    09224-00010
    Torque:
    without SST:
    44 N*m{449 kgf*cm, 32 ft.*lbf}
    with SST:
    40 N*m{408 kgf*cm, 30 ft.*lbf}
    Text in Illustration
    *1
    Fulcrum Length
    HINT:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.8 in.). When using a torque wrench with a fulcrum length that is not 300 mm (11.8 in.), calculate the torque specification for the torque wrench and SST based on the "without SST" torque specification (Click here).
    2. Make sure SST and the wrench are connected in a straight line.


3. INSTALL EXHAUST MANIFOLD ASSEMBLY RH


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. w/ Secondary Air Injection System:
    Install a new gasket to the No. 3 air tube.

    HINT:
    Install the gasket with the claws of the gasket facing the tube.


    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
  1. Install a new gasket to the cylinder head.

    Text in Illustration
    *1
    Tab
    *a
    Front
    HINT:
    Install the gasket with the gasket tab facing toward the front of the engine.


  1. w/ Secondary Air Injection System:



      Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
    1. Install the exhaust manifold to the cylinder head with the 7 new nuts labeled A.

      Torque:
      21 N*m{214 kgf*cm, 15 ft.*lbf}
    2. Install the exhaust manifold to the No. 3 air tube with the 2 nuts labeled B.

      Torque:
      10 N*m{102 kgf*cm, 7 ft.*lbf}
  1. w/o Secondary Air Injection System:
    Install the exhaust manifold with 7 new nuts.

    Torque:
    21 N*m{214 kgf*cm, 15 ft.*lbf}
  1. Connect the air fuel ratio sensor connector and attach the wire harness clamp.



4. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the heat insulator with 3 new bolts.

    Torque:
    10 N*m{102 kgf*cm, 7 ft.*lbf}


5. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Apply engine oil to a new O-ring, and then install the O-ring to the engine oil level dipstick guide.

  1. Install the engine oil level dipstick guide with the bolt.

    Torque:
    10 N*m{102 kgf*cm, 7 ft.*lbf}
  1. Attach the engine wire clamp.

  1. Install the engine oil level dipstick.



6. INSTALL MANIFOLD STAY
  1. Temporarily install the manifold stay with the 3 bolts.



    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
  1. Tighten the 3 bolts in the sequence shown in the illustration.

    Torque:
    40 N*m{408 kgf*cm, 30 ft.*lbf}


7. INSTALL EXHAUST MANIFOLD ASSEMBLY LH


    Land Cruiser. Urj200, 202 Grj200 Vdj200
  1. w/ Secondary Air Injection System:
    Install a new gasket to the No. 4 air tube.

    HINT:
    Install the gasket with the claws of the gasket facing the tube.


    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
  1. Install a new gasket to the cylinder head.

    Text in Illustration
    *1
    Tab
    *a
    Front
    HINT:
    Install the gasket with the gasket tab facing toward the rear of the engine.


  1. w/ Secondary Air Injection System:



      Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
    1. Install the exhaust manifold to the cylinder head with the 7 new nuts labeled A.

      Torque:
      21 N*m{214 kgf*cm, 15 ft.*lbf}
    2. Install the exhaust manifold to the No. 4 air tube with the 2 nuts labeled B.

      Torque:
      10 N*m{102 kgf*cm, 7 ft.*lbf}
  1. w/o Secondary Air Injection System:
    Install the exhaust manifold with 7 new nuts.

    Torque:
    21 N*m{214 kgf*cm, 15 ft.*lbf}
  1. Connect the air fuel ratio sensor connector and attach the wire harness clamp.



8. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the heat insulator with 3 new bolts.

    Torque:
    10 N*m{102 kgf*cm, 7 ft.*lbf}


9. INSTALL NO. 2 MANIFOLD STAY
  1. Temporarily install the manifold stay with the 3 bolts.



    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
  1. Tighten the 3 bolts in the sequence shown in the illustration.

    Torque:
    40 N*m{408 kgf*cm, 30 ft.*lbf}


10. INSTALL PROPELLER SHAFT HEAT INSULATOR
  1. Install the propeller shaft heat insulator with the 2 bolts.

    Torque:
    16 N*m{160 kgf*cm, 12 ft.*lbf}


11. INSTALL FRONT PROPELLER SHAFT ASSEMBLY
(Click here)


12. INSTALL FRONT EXHAUST PIPE ASSEMBLY
(Click here)


13. INSPECT FOR EXHAUST GAS LEAK
If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.


14. INSTALL FRONT FENDER APRON TRIM PACKING C
  1. Install the front fender apron trim packing C with the 4 clips.



15. INSTALL FRONT FENDER APRON TRIM PACKING A
  1. Install the front fender apron trim packing A with the 3 clips.



16. INSTALL FRONT FENDER APRON TRIM PACKING D
  1. Install the front fender apron trim packing D with the 4 clips.



17. INSTALL FRONT FENDER APRON TRIM PACKING B
  1. w/ KDSS
    Install the front fender apron trim packing B with the 3 clips.

  1. w/o KDSS
    Install the front fender apron trim packing B with the 4 clips.



18. INSTALL NO. 2 ENGINE UNDER COVER
  1. Install the No. 2 engine under cover with the 2 bolts.

    Torque:
    29 N*m{296 kgf*cm, 21 ft.*lbf}


19. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the No. 1 engine under cover sub-assembly with the 10 bolts.

    Torque:
    29 N*m{296 kgf*cm, 21 ft.*lbf}


20. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
  1. Push in the clip to install the front fender splash shield sub-assembly RH.

  1. Install the 3 bolts and 2 screws.



21. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
  1. Push in the clip to install the front fender splash shield sub-assembly LH.

  1. Install the 3 bolts and screw.



22. INSTALL AIR CLEANER AND HOSE
  1. Install the air cleaner and hose with the 3 bolts, and then tighten the hose clamp.

    Torque:
    for bolt:
    5.0 N*m{51 kgf*cm, 44 in.*lbf}
    for hose clamp:
    2.5 N*m{25 kgf*cm, 22 in.*lbf}
  1. Attach the clamp and connect the mass air flow meter connector.

  1. Connect the No. 2 PCV hose and No. 1 air hose.



23. INSTALL V-BANK COVER SUB-ASSEMBLY


    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Ur-Fe Intake Exhaust.Intake System.Exhaust Manifold  Installation
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

    Text in Illustration
    *1
    Grommet
    *2
    Pin
    *3
    Hook
    *4
    Bracket