Pcv Valve Installation

Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Gr-Fe Emission Control. Land Cruiser. Urj200, 202 Grj200 Vdj200

  1. INSTALL PCV VALVE SUB-ASSEMBLY

  2. INSTALL V-BANK COVER

Pcv Valve -- Installation



1. INSTALL PCV VALVE SUB-ASSEMBLY
  1. Apply adhesive to 2 or 3 threads of the PCV valve.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
  1. Install the PCV valve.

    Torque:
    27 N*m{275 kgf*cm, 20 ft.*lbf}
  1. Connect the PCV hose to the valve.

  1. Secure the hose with the clamp.



2. INSTALL V-BANK COVER


    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Gr-Fe Emission Control.Emission Control System (W/ Secondary Air Injection System).Pcv Valve  Installation
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

    Text in Illustration
    *1
    Pin
    *2
    Hook