Dtc P144C Open In Secondary Air Injection System Heater Control Circuit
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
INSPECT AIR PUMP HEATER RELAY (AIR PMP HTR)
CHECK AIR PUMP HEATER RELAY (POWER SOURCE)
CHECK HARNESS AND CONNECTOR (ECM - AIR PUMP HEATER RELAY (AI-PMP HTR))
DTC P144C Open in Secondary Air Injection System Heater Control Circuit |
DTC P144D Short in Secondary Air Injection System Heater Control Circuit |
DESCRIPTION
The ECM operates the air pump heater relay which causes the air pump heater to operate.DTC No.
| DTC Detection Condition
| Trouble Area
|
P144C
| Open or short in the air pump heater relay circuit for 5 seconds (1 trip detection logic).
| - Open or short in air pump heater relay circuit
- Air pump heater relay
- ECM
|
P144D
| Open or short in the air pump heater relay circuit for 5 seconds (1 trip detection logic).
| - Open or short in air pump heater relay circuit
- Air pump heater relay
- ECM
|
WIRING DIAGRAM
Refer to DTC P0412 (Click here).
INSPECTION PROCEDURE
- NOTICE:
- Inspect the fuses of circuits related to this system before performing the following inspection procedure.
- HINT:
- Read freeze frame data using the GTS. Freeze frame data records the engine condition when malfunctions are detected. When troubleshooting, freeze frame data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, if the air-fuel ratio was lean or rich, and other data from the time the malfunction occurred.
1.INSPECT AIR PUMP HEATER RELAY (AIR PMP HTR) |
Inspect the integration relay (AIR PMP HTR) (Click here).
| REPLACE INTEGRATION RELAY (AIR PMP HTR) |
|
|
2.CHECK AIR PUMP HEATER RELAY (POWER SOURCE) |
Remove the integration relay (AIR PMP HTR).
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
for LHD:Tester Connection
| Condition
| Specified Condition
|
1Y-1 - Body ground
| Always
| 11 to 14 V
|
for RHD:Tester Connection
| Condition
| Specified Condition
|
1X-1 - Body ground
| Always
| 11 to 14 V
|
Text in Illustration*A
| for LHD:
|
*B
| for RHD:
|
*a
| Front view of wire harness connector (to Integration Relay)
|
Reinstall the integration relay (AIR PMP HTR).
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
3.CHECK HARNESS AND CONNECTOR (ECM - AIR PUMP HEATER RELAY (AI-PMP HTR)) |
Remove the integration relay (AIR PMP HTR).
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance (Check for Open):
Tester Connection
| Condition
| Specified Condition
|
1P-10 - C45-61 (HAI1)
| Always
| Below 1 Ω
|
- Standard Resistance (Check for Short):
Tester Connection
| Condition
| Specified Condition
|
1P-10 or C45-61 (HAI1) - Body ground
| Always
| 10 kΩ or higher
|
Reinstall the integration relay (AIR PMP HTR).
Reconnect the ECM connector.
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|