Ecd System (For Dpf) Injector Circuit
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
CHECK INJECTOR DRIVER (POWER SOURCE)
INSPECT NO. 1 INTEGRATION RELAY (EDU RELAY)
CHECK HARNESS AND CONNECTOR (INJECTOR DRIVER - NO. 1 INTEGRATION RELAY)
CHECK HARNESS AND CONNECTOR (ECM - NO. 1 INTEGRATION RELAY)
ECD SYSTEM (for DPF) - Injector Circuit |
DESCRIPTION
The injector driver drives the injectors at high speeds with a high-voltage DC/DC converter. The ECM constantly monitors the injector driver and stops the engine if an abnormal condition is detected.
WIRING DIAGRAM
Refer to DTC P0201 (HILUX_TGN26 RM00000187V05IX_06.html).
INSPECTION PROCEDURE
- NOTICE:
- Inspect the fuses of circuits related to this system before performing the following inspection procedure.
- After replacing the ECM, the new ECM needs registration (HILUX_TGN26 RM0000012XK070X.html) and initialization (HILUX_TGN26 RM000000TIN057X.html).
- After replacing the fuel supply pump assembly, the ECM needs initialization (HILUX_TGN26 RM000000TIN057X.html).
- After replacing an injector assembly, the ECM needs registration (HILUX_TGN26 RM0000012XK070X.html).
1.CHECK INJECTOR DRIVER (POWER SOURCE) |
Disconnect the injector driver connectors.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
| Switch Condition
| Specified Condition
|
C107-2 (+B) - C107-4 (GND)
| Ignition switch ON
| 11 to 14 V
|
Text in Illustration*a
| Front view of wire harness connector (to Injector Driver)
|
Reconnect the injector driver connectors.
2.INSPECT NO. 1 INTEGRATION RELAY (EDU RELAY) |
Inspect the No. 1 integration relay (EDU relay) (HILUX_TGN26 RM00000469100PX_01_0005.html).
| REPLACE NO. 1 INTEGRATION RELAY (EDU RELAY) |
|
|
3.CHECK HARNESS AND CONNECTOR (INJECTOR DRIVER - NO. 1 INTEGRATION RELAY) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the injector driver connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
C107-2 (+B) - 1J-8
| Always
| Below 1 Ω
|
C107-4 (GND) - Body ground
| Always
| Below 1 Ω
|
C107-2 (+B) or 1J-8 - Body ground
| Always
| 10 kΩ or higher
|
Reconnect the injector driver connector.
Reinstall the No. 1 integration relay. | REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
4.CHECK HARNESS AND CONNECTOR (ECM - NO. 1 INTEGRATION RELAY) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
G148-12 (IREL) - 1J-7
| Always
| Below 1 Ω
|
G148-12 (IREL) or 1J-7 - Body ground
| Always
| 10 kΩ or higher
|
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|