Lighting System Acc Signal Circuit
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
READ VALUE USING TECHSTREAM
INSPECT FUSE (ACC)
CHECK HARNESS AND CONNECTOR (ACC POWER SOURCE CIRCUIT)
LIGHTING SYSTEM - ACC Signal Circuit |
DESCRIPTION
The main body ECU receives the ACC signal to control the illuminated entry system.
WIRING DIAGRAM
INSPECTION PROCEDURE
1.READ VALUE USING TECHSTREAM |
Connect the Techstream to the DLC3.
Turn the ignition switch to ON.
Turn the Techstream on.
Enter the following menus: Body Electrical / Main Body / Data List.
Read the display on the Techstream.
Main Body (Main Body ECU)Tester Display
| Measurement Item/Range
| Normal Condition
| Diagnostic Note
|
ACC SW
| Ignition switch ACC signal/ON or OFF
| ON: Ignition switch ACC OFF: Ignition switch off
| -
|
- OK:
- Normal conditions listed above are displayed.
Remove the ACC fuse from the instrument panel junction block.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
ACC fuse
| Always
| Below 1 Ω
|
3.CHECK HARNESS AND CONNECTOR (ACC POWER SOURCE CIRCUIT) |
Measure the voltage between the loading slot of the fuse and body ground.
- Standard Voltage:
Tester Connection
| Switch Condition
| Specified Condition
|
ACC fuse terminal - Body ground
| Ignition switch off
| Below 1 V
|
Ignition switch ACC
| 11 to 14 V
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
OK |
|
|
|
REPLACE MAIN BODY ECU (INSTRUMENT PANEL JUNCTION BLOCK) |
|