Lexus IS250 IS220d GSE20 ALE20 - PROPELLER SHAFT
REAR PROPELLER SHAFT ASSEMBLY (for 2AD-FHV) - REASSEMBLY
1. INSTALL NO. 1 CENTER SUPPORT BEARING ASSEMBLY |
Hold the propeller shaft assembly in a vise between aluminium plates.
- NOTICE:
- Do not grip the propeller shaft tube too tightly in a vise because this may cause deformation of the propeller shaft.

Using SST, install a new No. 1 dust deflector.
- SST
- 09316-60011(09316-00011)
09506-35010
09950-40011(09951-04020,09952-04010,09953-04030,09955-04021,09958-04011)
- NOTICE:
- Be careful not to damage the dust deflector.

Using SST, install the No. 1 center support bearing assembly.
- SST
- 09330-50010
09950-40011(09951-04020,09953-04030)
09950-00020
09950-50013(09952-05010)
- NOTICE:
- Be sure to install the bearing in the correct direction.

Using SST, insert a new No. 2 dust deflector until it almost touches the rubber of the No. 1 center support bearing assembly.
- SST
- 09330-50010
09950-40011(09951-04020,09953-04030)
09950-00020
09950-50013(09952-05010)
- NOTICE:
- Be careful not to damage the No. 2 dust deflector.

Using a snap ring expander, install a new snap ring.
2. INSTALL PROPELLER INTERMEDIATE SHAFT |

Install the dust boot.
- NOTICE:
- Assemble the propeller intermediate shaft assembly after wrapping vinyl tape around the spline so that it will not damage the boot.
Apply grease to the spline.
- Grease:
- Molybdenum disulphide lithium base NLGI No. 2 or equivalent
Align the matchmarks and assemble the intermediate shaft and propeller shaft.

Cover the adjusting nut with the dust boot.
- NOTICE:
- The directions of the intermediate shaft companion flange and the propeller shaft companion flange should differ by 180°.
Temporarily tighten the adjusting nut by hand.