Shift Solenoid Valve Inspection
INSPECT SHIFT SOLENOID VALVE SL
INSPECT SHIFT SOLENOID VALVE SLT
INSPECT SHIFT SOLENOID VALVE SLU
INSPECT SHIFT SOLENOID VALVE SL2
INSPECT SHIFT SOLENOID VALVE SL1
INSPECT SHIFT SOLENOID VALVE SL3
INSPECT SHIFT SOLENOID VALVE SL4
Shift Solenoid Valve -- Inspection |
1. INSPECT SHIFT SOLENOID VALVE SL |
Measure the resistance according to the value(s) in the table below.
Standard resistanceTester Connection
| Specified Condition 20°C (68°F)
|
Solenoid Connector (SL) - Solenoid Body (SL)
| 11 to 15 Ω
|
If the value is not as specified, replace the shift solenoid valve.
Connect the positive (+) lead to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the shift solenoid valve.
- OK:
- The solenoid makes an operating noise.
If the operation is not as specified, replace the shift solenoid valve.
2. INSPECT SHIFT SOLENOID VALVE SLT |
Measure the resistance according to the value(s) in the table below.
Standard resistanceTester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
If the value is not as specified, replace the shift solenoid valve.
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the shift solenoid valve.
- OK:
- The solenoid makes an operating noise.
If the operation is not as specified, replace the shift solenoid valve.
3. INSPECT SHIFT SOLENOID VALVE SLU |
Measure the resistance according to the value(s) in the table below.
Standard resistanceTester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
If the value is not as specified, replace the shift solenoid valve.
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the shift solenoid valve.
- OK:
- The solenoid makes an operating noise.
If the operation is not as specified, replace the shift solenoid valve.
4. INSPECT SHIFT SOLENOID VALVE SL2 |
Measure the resistance according to the value(s) in the table below.
Standard resistanceTester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
If the value is not as specified, replace the shift solenoid valve.
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the shift solenoid valve.
- OK:
- The solenoid makes an operating noise.
If the operation is not as specified, replace the shift solenoid valve.
5. INSPECT SHIFT SOLENOID VALVE SL1 |
Measure the resistance according to the value(s) in the table below.
Standard resistanceTester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
If the value is not as specified, replace the shift solenoid valve.
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the shift solenoid valve.
- OK:
- The solenoid makes an operating noise.
If the operation is not as specified, replace the shift solenoid valve.
6. INSPECT SHIFT SOLENOID VALVE SL3 |
Measure the resistance according to the value(s) in the table below.
Standard resistanceTester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
If the value is not as specified, replace the shift solenoid valve.
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the shift solenoid valve.
- OK:
- The solenoid makes an operating noise.
If the operation is not as specified, replace the shift solenoid valve.
7. INSPECT SHIFT SOLENOID VALVE SL4 |
Measure the resistance according to the value(s) in the table below.
Standard resistanceTester Connection
| Specified Condition 20°C (68°F)
|
1 - 2
| 5.0 to 5.6 Ω
|
If the value is not as specified, replace the shift solenoid valve.
Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the shift solenoid valve.
- OK:
- The solenoid makes an operating noise.
If the operation is not as specified, replace the shift solenoid valve.