Engine. Camry. Acv40 Gsv40
2Gr-Fe Starting. Camry. Acv40 Gsv40
Starter -- Installation |
1. INSTALL STARTER ASSEMBLY |
Install the starter assembly with the 2 bolts.
- Torque:
- 37 N*m{380 kgf*cm, 28 ft.*lbf}
![]() |
Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap.
- Torque:
- 9.8 N*m{100 kgf*cm, 87 in.*lbf}
Connect the terminal 50 connector to the starter assembly.
2. INSTALL NO. 1 AIR CLEANER INLET |
Install the No. 1 air cleaner inlet with the bolt.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
![]() |
3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY |
Install the air cleaner case with the 3 bolts.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
![]() |
Connect the vacuum hose and hose clamp.
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
Install the air cleaner cap sub-assembly, and connect the 3 bands.
![]() |
Connect the mass air flow meter connector (*1).
![]() |
Connect the No. 2 ventilation hose (*2).
Connect the hose band (*3).
Connect the 3 vacuum hoses.
![]() |
5. INSTALL AIR CLEANER INLET ASSEMBLY |
Install the air cleaner inlet with the clamp and 2 bolts.
- Torque:
- 5.0 N*m{51 kgf*cm, 44 in.*lbf}
![]() |
6. INSTALL V-BANK COVER SUB-ASSEMBLY |
Fit the 3 retainers and install the V-bank cover.
![]() |
7. INSTALL COOL AIR INTAKE DUCT SEAL |
Install the intake duct seal with the 7 clips.
![]() |
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- Torque:
- 6.9 N*m{70 kgf*cm, 61 in.*lbf}