Lexus IS250 IS220d GSE20 ALE20 2AD-FHV ENGINE CONTROL SYSTEM
DIESEL THROTTLE BODY - INSTALLATION
1. INSTALL DIESEL THROTTLE BODY |

Install a new gasket and the diesel throttle body with the 2 nuts and 2 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm, 16 ft.*lbf}
2. REMOVE NO. 4 AIR HOSE |
3. INSTALL AIR PIPE SUB-ASSEMBLY |

Connect the wire harness clamp.
Install the air pipe sub-assembly with the bolt.
- Torque:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}

Connect the intake air temperature sensor connector.
Tighten the 3 hose bands.
- Torque:
- 4.0 N*m{ 41 kgf*cm, 35 in.*lbf}

Connect the 2 diesel throttle body connectors.
4. INSTALL NO. 1 WATER OUTLET PIPE |

Install the No. 1 water outlet pipe with the 3 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm, 16 ft.*lbf}
Connect the 2 water hoses with the 2 bands.

Connect the manifold absolute pressure sensor connector and vacuum hose.
5. INSTALL NO. 2 EGR PIPE |

Install the intake manifold insulator.
- HINT:
- Insert the intake manifold insulator between the EGR valve and common rail to make contact with the intake manifold.
Install 2 new gaskets.

Temporarily install No. 2 EGR pipe with the bolt and nut.

Temporarily install the bolt and tighten the 2 bolts.
- Torque:
- 24 N*m{ 245 kgf*cm, 18 ft.*lbf}

Temporarily install the nut and tighten the 2 nuts.
- Torque:
- 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
6. INSTALL WIRING HARNESS CLAMP BRACKET |

Install the wiring harness clamp bracket with the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}

Connect the oil pressure switch assembly connector (*1).
Connect the EGR valve connector (*2).
Connect the 6 wire harness clamps (*3).

Connect the wire harness clamp.
7. ADD ENGINE COOLANT |
Tighten all the plugs.
- Torque:
- for cylinder block drain cock plug:
- 20 N*m{ 204 kgf*cm, 15 ft.*lbf}
Add engine coolant.
- Specified capacity:
- 8.9 liters (9.4 US qts, 7.8 lmp. qts)
- HINT:
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Squeeze the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level is low, add coolant.
Install the radiator cap.
Bleed air from the cooling system.
- NOTICE:
- Before starting the engine, turn the A/C switch off.
Warm up the engine until the thermostat opens. While the thermostat is open, allow the coolant to circulate for several minutes.
- HINT:
- The thermostat open timing can be confirmed by squeezing the inlet radiator hose by hand, and sensing vibrations when the engine coolant starts to flow inside the hose.
- NOTICE:
- When squeezing the radiator hose:
Maintain the engine speed at 2,000 to 2,500 rpm.
Squeeze the inlet and outlet radiator hoses several times by hand to bleed air from the system.
- NOTICE:
- When squeezing the radiator hoses:
Stop the engine and wait until the engine coolant cools down to ambient temperature.
- CAUTION:
- Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

Check the coolant level in the reserve tank.
If the coolant level is low, add coolant to the reserve tank FULL line.
8. CHECK FOR ENGINE COOLANT LEAKAGE |
- CAUTION:
- Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
- NOTICE:
- Before performing each inspection, turn the A/C switch off.

Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 177 kPa (1.8 kgf/cm, 26 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.
9. INSTALL ENGINE ROOM SIDE COVER LH |

Install the side cover with the 4 clips.
10. INSTALL NO. 1 AIR CLEANER INLET |

Install the inlet air cleaner with the bolt and clip.
- Torque:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
11. INSTALL COOL AIR INTAKE DUCT SEAL |

Install the intake duct seal with the 11 clips.
12. INSTALL NO. 1 ENGINE COVER |

Install the No. 1 engine cover.