Air Switching Valve -- Installation |
1. INSTALL AIR SWITCHING VALVE ASSEMBLY |
Set the No. 1 exhaust manifold heat insulator in place.
Install the air switching valve with 2 new nuts.
- Torque:
- 26 N*m{265 kgf*cm, 19 ft.*lbf}
Connect the connector.
Connect the vacuum hose.
2. INSTALL NO. 4 INTAKE PIPE |
Install 2 new gaskets and the No. 4 intake pipe with 4 new nuts in the order shown in the illustration. Tighten the nuts labeled 1 and 3 to the torque specification again.
- Torque:
- 26 N*m{265 kgf*cm, 19 ft.*lbf}
![]() |
Check that the nuts are tightened to the torque specification.
3. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR |
Install the No. 1 exhaust manifold heat insulator with the 5 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
4. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE |
Connect the No. 1 air injection system hose so that its paint mark aligns with the rib of the air switching valve as shown in the illustration.
Text in Illustration *a Upper *b RH Side *c Rib *d Paint Mark - HINT:
- Make sure the paint mark of the No. 1 air injection system hose is facing upward.
- Make sure the direction of the hose clamp is as shown in the illustration.
![]() |
5. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL RH |
Install the front No. 1 fender apron to frame seal with the 5 clips.
6. INSTALL AIR CLEANER CASE |
Install the air cleaner case with the 3 bolts.
- Torque:
- 12 N*m{122 kgf*cm, 9 ft.*lbf}
Install the air cleaner filter element sub-assembly.
7. INSTALL AIR CLEANER AND HOSE |
Install the air cleaner hose and align its matchmark with the matchmark of the intake air connector as shown in the illustration.
Text in Illustration *a Upper Side *b Front *c Matchmark
![]() |
Tighten the hose clamp.
- NOTICE:
- Check that the air cleaner hose is securely installed.
Attach the 4 clamps.
Connect the mass air flow meter connector and attach the 3 clamps.