Air Switching Valve (For Bank 2) -- Removal |
1. REMOVE PURGE VSV |
Remove the purge VSV (LandCruiser RM000002WOT018X.html).
2. REMOVE NO. 2 AIR TUBE |
Remove the 2 bolts, 2 nuts and No. 2 air tube.
![]() |
Remove the 2 gaskets from the No. 2 air tube.
- NOTICE:
- Be careful not to damage the installation surface of the gaskets.
3. REMOVE NO. 2 EMISSION CONTROL VALVE SET |
Disconnect the No. 2 emission control valve set connector.
![]() |
Disconnect the No. 3 air hose.
Remove the 3 nuts and No. 2 emission control valve set.
![]() |