Vacuum Switching Valve (For Engine Mounting) -- Installation |
1. INSTALL VACUUM SWITCHING VALVE SUB-ASSEMBLY |
Install the 2 vacuum hoses to the vacuum switching valve sub-assembly.
Install the vacuum switching valve sub-assembly with the bolt and nut.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the 3 vacuum hoses to the vacuum switching valve sub-assembly.
Connect the connector and 2 clamps to the vacuum switching valve sub-assembly.
2. CONNECT STARTER ASSEMBLY |
w/ Urea SCR System:
Temporarily install the starter assembly.
- NOTICE:
- Be careful not to drop the starter assembly.
- HINT:
- Tie the starter assembly with a string.
w/o Urea SCR System:
for Manual Transmission:
Install the starter assembly with the bolt and nut.- Torque:
- 68 N*m{693 kgf*cm, 50 ft.*lbf}
for Manual Transmission:
Connect the clutch release cylinder assembly with the 4 bolts, 3 nuts and a new clip.- Torque:
- for bolt A:
- 12 N*m{120 kgf*cm, 9 ft.*lbf}
- for bolt B, nut:
- 19 N*m{194 kgf*cm, 14 ft.*lbf}
Text in Illustration *a Bolt A *b Bolt B *c Nut for Automatic Transmission:
Install the starter assembly with the bolt and 2 nuts.- Torque:
- 68 N*m{693 kgf*cm, 50 ft.*lbf}
Connect the starter wire with the nut.
- Torque:
- 21 N*m{215 kgf*cm, 16 ft.*lbf}
Connect the starter connector.
Close the terminal cap.
3. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL LH |
Install the front No. 1 fender apron to frame seal LH with the 6 clips.