Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - HEATING / AIR CONDITIONING
AIR CONDITIONING AMPLIFIER - INSTALLATION
- HINT:
Use the same procedures for the LHD vehicle and RHD vehicle.
The procedures listed below are for the LHD vehicle.
1. INSTALL AIR CONDITIONER AMPLIFIER ASSEMBLY |

Install the amplifier with the screw.
Connect the connector.
2. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL |

Connect the connector.
Attach the 3 claws to install the lower No. 2 instrument panel finish panel.
Install the 4 bolts.
3. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH |

Attach the 6 claws to install the No. 3 instrument cluster finish panel garnish.
4. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY (w/ Passenger Side Knee Airbag) |

Connect the connector.
- NOTICE:
- When handling the airbag connector, take care not to damage the airbag wire harness.
Attach the 4 claws to install the front passenger side knee airbag.
Install the 4 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
5. INSTALL LOWER INSTRUMENT PANEL (w/o Passenger Side Knee Airbag) |

Attach the 4 claws to install the lower instrument panel.
Install the 2 bolts.
6. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover) |

Attach the 4 claws to install the No. 2 instrument panel under cover.
7. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH |

Attach the 7 claws to install the lower instrument panel pad sub-assembly.
Install the clip and screw.
8. INSTALL NO. 1 INSTRUMENT PANEL FINISH CUSHION |

Attach the 7 claws to install the No. 1 instrument panel finish panel cushion.
9. INSTALL FRONT DOOR SCUFF PLATE RH |
w/ Sliding Roof:
()
w/o Sliding Roof:
()
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (w/ Passenger Side Knee Airbag) |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected ().
11. CHECK SRS WARNING LIGHT (w/ Passenger Side Knee Airbag) |
()