Vacuum Switching Valve Installation
INSTALL VACUUM SWITCHING VALVE (for EGR Cut)
INSTALL VACUUM TRANSMITTING HOSE ASSEMBLY
INSTALL NO. 2 VACUUM TRANSMITTING HOSE ASSEMBLY
INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE
Vacuum Switching Valve -- Installation |
1. INSTALL VACUUM SWITCHING VALVE (for EGR Cut) |
Install the vacuum switching valve to the manifold stay with the screw.
- Torque:
- 3.5 N*m{36 kgf*cm, 31 in.*lbf}
2. INSTALL VACUUM TRANSMITTING HOSE ASSEMBLY |
Install the vacuum transmitting hose shown in the illustration.
Text in Illustration*1
| Yellow Paint
|
3. INSTALL NO. 2 VACUUM TRANSMITTING HOSE ASSEMBLY |
Install the No. 2 vacuum transmitting hose to the vacuum switching valve shown in the illustration.
Text in Illustration*1
| Pink Paint
|
4. INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE |
Install the manifold stay with vacuum switching valve with the 2 bolts and connect the vacuum transmitting hose.
- Torque:
- 19 N*m{194 kgf*cm, 14 ft.*lbf}
- NOTICE:
- Be sure to securely connect the vacuum transmitting hose.
Connect the 2 vacuum transmitting hoses.
Text in Illustration*1
| Yellow Paint
|
*2
| Pink Paint
|
- NOTICE:
- Be sure to securely connect the vacuum transmitting hoses.
- Make sure the vacuum transmitting hoses' color matches the connection areas' color.
Connect the vacuum switching valve connector.