Fuel Injection Pump -- On-Vehicle Inspection |
1. CHECK INJECTION PUMP |
Inspect the engine speed sensor.
Measure the resistance of the sensor.
- Standard resistance:
Tester Connection Condition Specified Condition 1 (NE-) - 2 (NE+) 20°C (68°F) 205 to 255 Ω
![]() |
Inspect the spill control valve.
Measure the resistance of the spill control valve.
- Standard resistance:
Tester Connection Condition Specified Condition 1 (SPV-) - 2 (SPV+) 20°C (68°F) 1 to 2 Ω
![]() |
2. CHECK TIMING CONTROL VALVE |
Inspect the timing control valve.
Measure the resistance of the timing control valve.
- Standard resistance:
Tester Connection Condition Specified Condition 1 (+B) - 2 (TCV) 20°C (68°F) 10 to 14 Ω
![]() |
Inspect the timing control valve operation.
Connect the battery's positive (+) lead to the timing control terminal +B.
Connect the battery's negative (-) lead to the timing control valve terminal TCV.
Check that the solenoid makes a "click" sound.
- CAUTION:
- Do not apply voltage for more than 30 seconds to avoid burning out the timing control valve solenoid.
- When performing this step, wait until the solenoid coils become cool enough that the solenoid can be touched by hand.