Roof Drip Side Finish Moulding Installation


  1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

  2. INSTALL ROOF DRIP SIDE FINISH MOULDING LH

Roof Drip Side Finish Moulding -- Installation


HINT:
  1. Use the same procedure for the RH and LH sides.
  2. The procedure listed below is for the LH side.


1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
NOTICE:
  1. It is only necessary to perform this procedure when replacing a No. 1 roof drip side finish moulding clip with a new one.
  2. If installing new No. 1 roof drip side finish moulding clips, remove the adhesive remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.
HINT:
When installing a No. 1 roof drip side finish moulding clip, heat the vehicle body and clip using a heat light.
Standard:
Item
Temperature
Vehicle Body
40 to 60°C (104 to 140°F)
No. 1 Roof Drip Side Finish Moulding Clip
20 to 30°C (68 to 86°F)
NOTICE:
Do not heat the vehicle body or clip excessively.


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.Exterior.Roof Drip Side Finish Moulding.Roof Drip Side Finish Moulding  Installation
  1. Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new No. 1 roof drip side finish moulding clips.

    Text in Illustration
    *1
    Adhesive
    *a
    2 to 3 mm Bead of Adhesive
    HINT:
    Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1991 psi) or more (when the temperature is 23°C (73°F))
  1. Apply primer to the body where the No. 1 roof drip side finish moulding clip will be installed.

    NOTICE:
    Do not let the primer dry.


  1. While using the position shown in the illustration as a reference, place the No. 1 roof drip side finish moulding clip onto the roof panel. Then position and install the clip after lightly pressing it so that the adhesive adheres to the primer.


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.Exterior.Roof Drip Side Finish Moulding.Roof Drip Side Finish Moulding  Installation


    Standard:

    Area
    Measurement (Reference Value)
    Area
    Measurement (Reference Value)
    A
    29.1 mm (1.15 in.)
    D
    30.4 mm (1.20 in.)
    B
    5.5 to 6.0 mm (0.217 to 0.236 in.)
    E
    5.4 to 5.9 mm (0.213 to 0.232 in.)
    C
    6.0 mm (0.236 in.)
    F
    6.7 mm (0.264 in.)
    NOTICE:
    Install the rear roof drip side finish moulding when 40 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clips.
    HINT:
    1. Initial hardening time: 40 minutes
    2. Complete hardening time: 48 hours


2. INSTALL ROOF DRIP SIDE FINISH MOULDING LH
  1. Attach the 2 clips to install the roof drip side finish moulding.