Air Conditioning System (For Automatic Air Conditioning System) Back-Up Power Source Circuit


DESCRIPTION

WIRING DIAGRAM

INSPECTION PROCEDURE

CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND)

AIR CONDITIONING SYSTEM (for Automatic Air Conditioning System) - Back-up Power Source Circuit


DESCRIPTION

This is the back-up power source circuit for the air conditioning amplifier. Power is supplied even when the ignition switch is off and is used for DTC memory and various other purposes.

WIRING DIAGRAM


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.Air Conditioning.Air Conditioning System (For Automatic Air Conditioning System).Air Conditioning System (For Automatic Air Conditioning System)  Back-Up Power Source Circuit


INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
1.CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY AND BODY GROUND)


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.Air Conditioning.Air Conditioning System (For Automatic Air Conditioning System).Air Conditioning System (For Automatic Air Conditioning System)  Back-Up Power Source Circuit
  1. Disconnect the A16 amplifier connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    A16-5 (+B1) - Body ground
    Always
    11 to 14 V
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    A16-1 (GND) - Body ground
    Always
    Below 1 Ω


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Toyota Fortuner RM000003S6F000X.html)