Air Conditioning Switch -- Installation |
1. INSTALL A/C SWITCH |
Attach the 2 claws to install the switch.
![]() |
2. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY CENTER |
![]() |
Connect all connectors.
Attach the 6 claws and 4 clips to install the panel.
Install the panel with the screw <C>.
3. INSTALL FRE/REC CONTROL KNOB |
4. INSTALL HEATER CONTROL KNOB |
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |