Intake Manifold -- Inspection |
1. INSPECT INTAKE MANIFOLD |
- NOTICE:
![]() |
- Do not adjust the adjusting screw or 2 actuator installation bolts.
Disconnect the vacuum hose from the actuator.
Text in Illustration *a Disconnect
![]() |
Check the operation of the swirl control valve.
Check that the valve is fully opened under normal conditions.
Connect a vacuum pump to the control valve. Check that the valve is fully closed when a negative pressure of 35 kPa (263 mmHg, 10 in.Hg) is applied.
Leave it for 1 minute and check that the vacuum pump needle does not move.
If the result is not as specified, replace the intake manifold.
2. INSPECT VACUUM SWITCHING VALVE (for Swirl Control Valve) |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection Condition Specified Condition 1 - 2 20°C (68°F) 33 to 39 Ω 1 - Body ground
2 - Body ground20°C (68°F) 10 kΩ or higher
Check the operation according to the value(s) in the table below.
Text in Illustration *1 Port E *2 Filter Airflow Check that air flows from port E to the filter.
If the result is not as specified, replace the intake manifold.Apply battery voltage across the terminals.
Text in Illustration *1 Port E *2 Port F Airflow Check that air flows from port E to port F.
If the result is not as specified, replace the intake manifold.
![]() |