Electric Egr Control Valve Installation


  1. INSTALL VACUUM SWITCHING VALVE (for EGR Cut)

  2. INSTALL EGR VALVE

  3. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY

  4. INSTALL INTAKE AIR CONNECTOR

  5. INSTALL THROTTLE BODY BRACKET

  6. INSTALL DIESEL THROTTLE BODY ASSEMBLY

  7. INSTALL VACUUM SWITCHING VALVE BRACKET

  8. INSTALL CHARGE AIR COOLER ASSEMBLY

  9. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Electric Egr Control Valve -- Installation



1. INSTALL VACUUM SWITCHING VALVE (for EGR Cut)


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50
  1. Install the valve with the bolt.

    Torque:
    3.5 N*m{36 kgf*cm, 31 in.*lbf}


2. INSTALL EGR VALVE
  1. Install a new gasket and the EGR valve.



3. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.1Kd-Ftv Emission Control.Electric Egr Control Valve.Electric Egr Control Valve  Installation
  1. Install 2 new gaskets and the pipe with the 2 nuts and 2 bolts.

    Torque:
    13 N*m{133 kgf*cm, 10 ft.*lbf}
    HINT:
    The gasket's claws should be on the pipe side.


4. INSTALL INTAKE AIR CONNECTOR


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50
  1. Install a new gasket and the air connector with the 2 nuts and bolt.

    Torque:
    20 N*m{204 kgf*cm, 15 ft.*lbf}


5. INSTALL THROTTLE BODY BRACKET
  1. Install the bracket with the 3 bolts.

    Torque:
    20 N*m{204 kgf*cm, 15 ft.*lbf}


6. INSTALL DIESEL THROTTLE BODY ASSEMBLY


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50
  1. Install a new gasket and the throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{204 kgf*cm, 15 ft.*lbf}


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50
  1. Connect the throttle control motor connector.

  1. Connect the throttle position sensor connector.



7. INSTALL VACUUM SWITCHING VALVE BRACKET


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50
  1. Install the bracket with the 2 bolts.

    Torque:
    20 N*m{204 kgf*cm, 15 ft.*lbf}
  1. Connect the vacuum hoses to the 3 locations.

  1. Connect the 2 connectors.



8. INSTALL CHARGE AIR COOLER ASSEMBLY


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50
  1. Install a new gasket and the intake air connector with the 4 bolts.

    Torque:
    10 N*m{102 kgf*cm, 7 ft.*lbf}


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50
  1. Using a 22 mm deep socket wrench, install a new gasket and the IAT sensor.

    Torque:
    29.4 N*m{300 kgf*cm, 22 ft.*lbf}


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.1Kd-Ftv Emission Control.Electric Egr Control Valve.Electric Egr Control Valve  Installation
  1. Install the CAC with the 4 bolts.

    Torque:
    32 N*m{326 kgf*cm, 24 ft.*lbf} for bolt A
    Torque:
    12 N*m{122 kgf*cm, 9 ft.*lbf} for bolt B
  1. Install a new No. 2 air hose and then tighten the 2 hose clamps.

    Torque:
    6.5 N*m{66 kgf*cm, 58 in.*lbf}
  1. Tighten the 2 hose clamps of the No. 1 air hose.

    Torque:
    6.5 N*m{66 kgf*cm, 58 in.*lbf}
  1. Connect the diesel turbo IAT sensor connector.



9. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.1Kd-Ftv Emission Control.Electric Egr Control Valve.Electric Egr Control Valve  Installation
  1. Install the engine cover with the 3 bolts and 2 nuts.

    Torque:
    7.0 N*m{71 kgf*cm, 62 in.*lbf}


10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL