Floor Shift Assembly Installation


  1. INSTALL FLOOR SHIFT ASSEMBLY

  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

  3. PERFORM INITIALIZATION

  4. ADJUST SHIFT LEVER POSITION

  5. INSPECT SHIFT LEVER POSITION

  6. INSTALL CONSOLE BOX ASSEMBLY

  7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY

  8. INSTALL PARKING BRAKE HOLE COVER SUB-ASSEMBLY

Floor Shift Assembly -- Installation



1. INSTALL FLOOR SHIFT ASSEMBLY


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.A750E Automatic Transmission.Floor Shift Assembly.Floor Shift Assembly  Installation
  1. Install the floor shift with the 4 bolts.

    Torque:
    14 N*m{143 kgf*cm, 10 ft.*lbf}


    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.A750E Automatic Transmission.Floor Shift Assembly.Floor Shift Assembly  Installation
  1. Connect the clamp and 2 connectors.

  1. Move the shift lever to L.

  1. Connect the transmission control cable.



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.


3. PERFORM INITIALIZATION
HINT:
Refer to "INTRODUCTION REPAIR INSTRUCTION-INITIALIZATION" and perform initialization.


4. ADJUST SHIFT LEVER POSITION


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.A750E Automatic Transmission.Floor Shift Assembly.Floor Shift Assembly  Installation
  1. Remove the nut and disconnect the control cable.

  1. Remove the clip and disconnect the control cable from the control cable bracket.



    Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.A750E Automatic Transmission.Floor Shift Assembly.Floor Shift Assembly  Installation
  1. Push the control shaft rearward as much as possible.

  1. Return the control shaft lever 2 notches to the N position.

  1. While holding the control shaft lever slightly toward the R position side, tighten the nut.

    Torque:
    16 N*m{163 kgf*cm, 12 ft.*lbf}


5. INSPECT SHIFT LEVER POSITION
  1. When moving the shift lever from P to R with the ignition switch ON and the brake pedal depressed, make sure that the shift lever moves smoothly and correctly into position.

  1. Start the engine and make sure that the vehicle moves forward after moving the shift lever from N to D, and moves rearward after shifting to the R.
    If the results are not as specified, inspect the park/neutral position switch and check the shift lever.



6. INSTALL CONSOLE BOX ASSEMBLY


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.A750E Automatic Transmission.Floor Shift Assembly.Floor Shift Assembly  Installation
  1. Install the console box with the 2 clips, 4 screws <F> and 2 bolts <E>.



7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.A750E Automatic Transmission.Floor Shift Assembly.Floor Shift Assembly  Installation
NOTICE:
Be careful not to damage the instrument panel lower and console box with the claws of the upper console panel.
  1. Attach the 12 claws to install the console panel.



8. INSTALL PARKING BRAKE HOLE COVER SUB-ASSEMBLY


Toyota Fortuner. Ggn50, 60 Kun51, 61 Tgn51 Lan50.A750E Automatic Transmission.Floor Shift Assembly.Floor Shift Assembly  Installation
  1. Attach the 4 claws to install the hole cover.