Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - SUPPLEMENTAL RESTRAINT SYSTEMS
KNEE AIRBAG ASSEMBLY (for Driver Side) - INSTALLATION
- HINT:
1. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY |

Connect the connector.
- NOTICE:
- When handling the airbag connector, take care not to damage the airbag wire harness.
Install the driver side knee airbag with the 5 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
2. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL |
Connect the connectors.

for Automatic Air Conditioning System:
Attach the 2 claws to install the room temperature sensor.

Attach the 2 claws to connect the 2 control cables.
w/ Driver Side Knee Airbag:
Attach the 16 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.
w/o Driver Side Knee Airbag:
Attach the 9 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.

Attach the 2 claws to close the hole cover.
3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover) |

Connect the connectors.
Attach the 3 claws to install the No. 1 instrument panel under cover.
Install the 2 screws.
4. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH |
Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.
*A | w/ Entry and Start System | *B | w/o Entry and Start System |
5. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH |

Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.
6. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH |

Connect the connectors and attach the 2 clamps.
Attach the 8 claws to install the lower instrument panel pad sub-assembly.
Install the clip and screw.
7. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION |

Attach the 7 claws to install the No. 1 instrument panel finish panel cushion.
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected ().
9. CHECK SRS WARNING LIGHT |
Check the SRS warning light ().