Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - DOOR / HATCH

HOOD LOCK CONTROL CABLE ASSEMBLY - INSTALLATION

  • HINT:
  • A bolt without a torque specification is shown in the standard bolt chart ().
1. INSTALL HOOD LOCK CONTROL CABLE ASSEMBLY (for LHD)

Pass the cable into the engine room.

Pass the cable rear side through the grommet until the cable stopper is attached to the grommet.

Pass the cable front side through the upper radiator support.

Connect the clamps shown in the illustration.

Hood Lock Control Cable Assembly - Installation. DOOR / HATCH. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

2. INSTALL HOOD LOCK CONTROL CABLE ASSEMBLY (for RHD)

Pass the cable into the engine room.

Pass the cable rear side through the grommet until the cable stopper is attached to the grommet.

Pass the cable front side through the upper radiator support.

Connect the clamps shown in the illustration.

Hood Lock Control Cable Assembly - Installation. DOOR / HATCH. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

3. INSTALL HOOD LOCK CONTROL LEVER SUB-ASSEMBLY

Connect the hood lock control cable and attach the 2 claws to install the hood lock lever.

4. INSTALL FRONT FENDER MAIN SEAL LH (for LHD)

Attach the 3 clips to install the fender main seal.

5. INSTALL FRONT FENDER MAIN SEAL RH (for RHD)

Attach the 3 clips to install the fender main seal.

6. INSTALL HOOD LOCK ASSEMBLY
Hood Lock Control Cable Assembly - Installation. DOOR / HATCH. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Apply MP grease to the sliding areas of the lock.

Connect the hood lock control cable.

Install the hood lock.

Install the 2 bolts and nut.

  • Torque:
  • 5.5 N*m{ 56 kgf*cm, 49 in.*lbf}

Connect the connector.

7. INSTALL HOOD LOCK NUT CAP
Hood Lock Control Cable Assembly - Installation. DOOR / HATCH. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install a new hood lock nut cap.

8. INSTALL HOOD LOCK CONTROL CABLE COVER

Attach the claw to install the cable cover.

Install the 3 screws.

9. INSTALL MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System)

Temporarily install the millimeter wave radar sensor assembly with the 3 bolts.

Hood Lock Control Cable Assembly - Installation. DOOR / HATCH. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Tighten the 3 bolts in alphabetical order.

  • Torque:
  • 5.5 N*m{ 56 kgf*cm, 49 in.*lbf}

Connect the sensor connector.

  • NOTICE:
  • Do not use a sensor which has been dropped or subjected to any strong shocks.
10. INSTALL RADIATOR GRILLE

w/ Wide View Front Monitor System:

Connect the connector.

Attach the 2 clips and 8 claws to install the radiator grille assembly.

Install the 3 screws.

11. INSTALL FRONT BUMPER WINCH COVER SUB-ASSEMBLY (w/ Winch)

Attach the 3 guides.

Attach the 2 claws and front bumper winch cover sub-assembly.

12. INSTALL UPPER RADIATOR SUPPORT SEAL

Install the radiator support seal with the 7 clips.

Hood Lock Control Cable Assembly - Installation. DOOR / HATCH. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

13. ADJUST MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System)

()