Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1VD-FTV BATTERY / CHARGING
GENERATOR - REASSEMBLY
1. INSTALL GENERATOR ROTOR ASSEMBLY |

Place the drive end frame on the pulley.
Install the rotor to the drive end frame.
2. INSTALL GENERATOR COIL ASSEMBLY |

Place the generator washer on the rotor.

Using a 21 mm socket wrench and a press, slowly press in the coil assembly.

130 A Type and 150 A Type:
Install the 4 bolts.
- Torque:
- 5.8 N*m{ 59 kgf*cm, 51 in.*lbf}
180 A Type:
Install the 4 bolts.
- Torque:
- 7.5 N*m{ 76 kgf*cm, 66 in.*lbf}
3. INSTALL GENERATOR BRUSH HOLDER ASSEMBLY |

While pushing the 2 brushes toward the inside of the brush holder, insert a pin (diameter: 1.0 mm (0.0394 in.)) into the brush holder hole.

Install the generator brush holder with the 2 screws.
- Torque:
- 1.8 N*m{ 18 kgf*cm, 16 in.*lbf}
Pull out the pin from the generator brush holder.
4. INSTALL GENERATOR REAR END COVER |

Install the terminal insulator to the generator rectifier end frame.
- NOTICE:
- Pay attention to the mounting orientation of the terminal insulator.

Install the end cover with the 3 nuts.
- Torque:
- 4.6 N*m{ 46 kgf*cm, 40 in.*lbf}
5. INSTALL GENERATOR PULLEY |

- SST
- 09820-63011(09820-06010,09820-06021)
- HINT:
SST 1-A and 1-B | 09820-06010 |
SST 2 | 09820-06021 |
Install the pulley onto the rotor shaft by tightening the pulley nut by hand.
Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.
- Torque:
- 39 N*m{ 398 kgf*cm, 29 ft.*lbf}
- NOTICE:
- Check that SST is secured to the rotor shaft.

Mount SST 2 in a vise.
Insert SST 1-A and B into SST 2, and attach the pulley nut to SST 2.

Tighten the pulley nut by turning SST 1-A in the direction shown in the illustration.
- Torque:
- 133 N*m{ 1351 kgf*cm, 98 ft.*lbf}
Remove the generator from SST 2.

Turn SST 1-B, and remove SST 1-A and 1-B.
Turn the pulley and check that the pulley moves smoothly.