Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL
PURGE VALVE - INSTALLATION
1. INSTALL PURGE VSV |
Install the purge VSV with the bolt.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
Connect the 2 purge line hoses.
Connect the purge VSV connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY |

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
*1 | Grommet |
*2 | Pin |
*3 | Hook |
*4 | Bracket |