Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE EMISSION CONTROL
PURGE VALVE - INSTALLATION
1. INSTALL PURGE VSV |
Install the purge VSV with the bolt.
- Torque:
- 9.0 N*m{ 92 kgf*cm, 80 in.*lbf}
Connect the 2 purge line hoses.
Connect the purge VSV connector.
2. INSTALL V-BANK COVER |

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
*1 | Pin |
*2 | Hook |