Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 3UR-FE EMISSION CONTROL
PCV VALVE - INSTALLATION
1. INSTALL PCV VALVE SUB-ASSEMBLY |

Apply a light coat of engine oil to the O-ring of the valve.
*1 | O-Ring |
- HINT:
- When reusing the PCV valve, inspect the O-ring. If the O-ring has scratches or cuts, replace the PCV valve.
Install the PCV valve.
- Torque:
- 3.5 N*m{ 36 kgf*cm, 31 in.*lbf}
2. INSTALL PCV VALVE HOSE |
Install the hose to the PCV valve.
3. INSTALL NO. 2 ENGINE COVER |
4. INSTALL INTAKE MANIFOLD |
()