Oil Pump - Reassembly

Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE LUBRICATION

OIL PUMP - REASSEMBLY

1. INSTALL OIL PUMP RELIEF VALVE

Coat the relief valve with engine oil and insert the relief valve and spring into the valve hole.

Install the relief valve plug.

  • Torque:
  • 49 N*m{ 500 kgf*cm, 36 ft.*lbf}
2. INSTALL OIL PUMP COVER

Apply fresh engine oil to the drive and driven rotors.

Oil Pump - Reassembly. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Place the drive and driven rotors into the timing chain cover with the marks facing the oil pump cover side.

Text in Illustration
*1Mark
Oil Pump - Reassembly. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200

Install the oil pump cover with the 8 bolts and screw.

  • Torque:
  • for screw:
  • 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
  • for bolt:
  • 9.1 N*m{ 93 kgf*cm, 81 in.*lbf}
Text in Illustration
Oil Pump - Reassembly. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Bolt
Oil Pump - Reassembly. 1GR-FE LUBRICATION. Land Cruiser URJ200  URJ202 GRJ200 VDJ200Screw