Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE ENGINE CONTROL
KNOCK SENSOR - INSTALLATION
1. INSTALL KNOCK SENSOR |

Install the 2 sensors with the 2 bolts as shown in the illustration.
- Torque:
- 20 N*m{ 204 kgf*cm, 15 ft.*lbf}
*A | for Bank 2 |
*B | for Bank 1 |
*a | Engine Rear |
*b | Top |
*c | Engine Front |
*d | 0 to 15° |
Connect the 2 sensor connectors.
2. INSTALL NO. 1 WATER OUTLET PIPE |
Install the water outlet pipe with the 2 nuts and bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Attach the 3 wire harness clamps.
3. INSTALL CYLINDER HEAD SUB-ASSEMBLY (for Bank 1) |
()