Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE ENGINE MECHANICAL
ENGINE UNIT - INSTALLATION
1. INSTALL NOISE FILTER |
for Bank 2:
Install the noise filter to the cylinder head cover with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
for Bank 1:
Install the noise filter to the cylinder head cover with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
2. INSTALL IGNITION COIL ASSEMBLY |
Install the 8 ignition coils with the 8 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
3. INSTALL NO. 11 WATER BY-PASS HOSE |

Install the No. 11 water by-pass hose.
*1 | Paint Mark |
*a | Rear |
*b | Front |
- HINT:
4. INSTALL ENGINE WIRE |
Attach the 3 wire harness clamps to install the engine wire.
Connect the 4 knock sensor connectors.
Install the bolt.
- Torque:
- 8.0 N*m{ 82 kgf*cm, 71 in.*lbf}
5. INSTALL NO. 1 ENGINE COVER |
6. INSTALL NO. 2 ENGINE COVER |
7. INSTALL SEPARATOR CASE |
Install the separator case with the 4 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
8. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY |
Install the No. 1 idler pulley with the bolt.
- Torque:
- 43 N*m{ 438 kgf*cm, 32 ft.*lbf}
9. INSTALL WATER PUMP PULLEY |
Temporarily install the water pump pulley with the 4 bolts.

Using SST, hold the water pump pulley and tighten the 4 bolts.
- SST
- 09960-10010(09962-01000,09963-01000)
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
10. INSTALL NO. 1 WATER BY-PASS HOSE |
11. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY |
Connect the 4 hoses.
Install the water by-pass pipe with the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
12. INSTALL NO. 3 ENGINE COVER |

Install the No. 3 engine cover.
![]() | Engine Front |
- HINT:
- Position the No. 3 engine cover so that the arrow mark faces the front of the engine and install it.
13. INSTALL NO. 4 ENGINE COVER |

Install the No. 4 engine cover.
![]() | Engine Front |
- HINT:
- Position the No. 4 engine cover so that the arrow mark faces the front of the engine and install it.
14. INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY |
Install the 2 delivery pipe spacers and 4 insulators to the cylinder head LH.
Install the delivery pipe together with the injectors to the cylinder head LH.
Install the 2 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
- NOTICE:

- Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.
*1 | Fuel Delivery Pipe |
*2 | Fuel Injector |
*a | CORRECT |
*b | INCORRECT |
Connect the No. 7 wire harness connector.
15. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
Install the 2 delivery pipe spacers and 4 insulators to the cylinder head RH.
Install the delivery pipe together with the injectors to the cylinder head RH.
Install the 2 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
- NOTICE:

- Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.
*1 | Fuel Delivery Pipe |
*2 | Fuel Injector |
*a | CORRECT |
*b | INCORRECT |
Connect the No. 6 wire harness connector.
16. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH |
Install the front No. 1 engine mounting bracket LH with the 4 bolts.
- Torque:
- 35 N*m{ 357 kgf*cm, 26 ft.*lbf}
17. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH |
Install the front No. 1 engine mounting bracket RH with the 4 bolts.
- Torque:
- 35 N*m{ 357 kgf*cm, 26 ft.*lbf}
18. INSTALL NO. 1 EGR PIPE BRACKET |
Install the No. 1 EGR pipe bracket with the 3 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}
19. INSTALL NO. 1 WATER OUTLET PIPE |
Install the No. 1 water outlet pipe with the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
20. CONNECT NO. 11 WATER BY-PASS HOSE |

Connect the No. 11 water by-pass hose.
*1 | Paint Mark |
*a | Upper Side |
- HINT:
- The direction of the hose clamp is indicated in the illustration.
21. INSTALL NO. 8 WATER BY-PASS HOSE |

Install the No. 8 water by-pass hose.
*1 | Paint Mark |
*a | Upper Side |
*b | Front |
- HINT:
22. INSTALL NO. 2 WATER BY-PASS PIPE |

Install the No. 2 water by-pass pipe with the 2 bolts and connect the hose.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
*1 | Paint Mark |
*a | Upper Side |
- HINT:
23. INSTALL NO. 3 AIR TUBE (w/ Secondary Air Injection System) |
Install the No. 3 air tube with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
24. INSTALL NO. 4 AIR TUBE (w/ Secondary Air Injection System) |
Install the No. 4 air tube with the bolt.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
25. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 2) |
26. INSTALL FUEL TUBE SUB-ASSEMBLY |
Install the fuel tube ().
Install the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
27. INSTALL FUEL HOSE |
Install the fuel hose ().
Install the fuel pipe clamp.
Connect the 2 clamps.
28. INSTALL ENGINE WIRE |