Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE EMISSION CONTROL
AIR SWITCHING VALVE (for Bank 2) - INSTALLATION
1. INSTALL NO. 2 EMISSION CONTROL VALVE SET |
Install the No. 2 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}

Align the paint mark with the rib and connect the No. 1 air hose.
*1 | Paint Mark |
*2 | Rib |
*a | Top |
*b | LH Side |
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the No. 2 emission control valve set connector.
2. INSTALL NO. 2 AIR TUBE |

Install 2 new gaskets.
*1 | Claw |
*2 | No. 2 Air Tube |
- NOTICE:
- Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.
Install the No. 2 air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
3. INSTALL PURGE VSV |
Install the purge VSV ().