Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1UR-FE EMISSION CONTROL
AIR SWITCHING VALVE (for Bank 1) - INSTALLATION
1. INSTALL AIR SWITCHING VALVE ASSEMBLY |

Install a new gasket and the air switching valve with the 3 bolts.
- Torque:
- 24 N*m{ 245 kgf*cm, 18 ft.*lbf}
*1 | No. 4 Air Tube |
*2 | Claw |
*3 | Air Switching Valve |
- NOTICE:
- Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.
Install the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
Connect the wire harness clamp bracket with the bolt.
- Torque:
- 8.0 N*m{ 82 kgf*cm, 71 in.*lbf}
2. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE |

Connect the No. 2 air injection system hose.
*1 | Protrusion |
*2 | Paint Mark |
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the connector.
3. INSTALL V-BANK COVER SUB-ASSEMBLY |

Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
*1 | Grommet |
*2 | Pin |
*3 | Hook |
*4 | Bracket |