Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE EMISSION CONTROL
AIR SWITCHING VALVE (for Bank 1) - INSTALLATION
1. INSTALL NO. 1 EMISSION CONTROL VALVE SET |
Install the No. 1 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm, 15 ft.*lbf}

Align the paint mark with the rib and connect the No. 1 air hose.
*1 | Rib |
*2 | Paint Mark |
*a | RH Side |
*b | Top |
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the No. 1 emission control valve set connector.
2. INSTALL AIR TUBE |

Install 2 new gaskets.
*1 | Claw |
*2 | Air Tube |
- NOTICE:
- Make sure the gasket's claws are not caught between the No. 1 emission control valve set and air tube.
Install the air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 in.*lbf}
3. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose.
Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.
- Torque:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
Tighten the clamp.
- Torque:
- 2.5 N*m{ 25 kgf*cm, 22 in.*lbf}
Attach the clamp and connect the ventilation hose, vacuum hose and mass air flow meter connector.
4. INSTALL V-BANK COVER |

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
*1 | Pin |
*2 | Hook |