Land Cruiser URJ200 URJ202 GRJ200 VDJ200 - 1GR-FE EMISSION CONTROL
AIR PUMP - INSPECTION
1. INSPECT AIR PUMP ASSEMBLY |
Check the heater resistance.

Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection Condition Specified Condition 1 (APH+) - 3 (APHG) -20°C (-4°F) 3.6 to 17.6 Ω -10°C (14°F) 3.4 to 16.5 Ω 0°C (32°F) 3.1 to 15.4 Ω 10°C (50°F) 2.8 to 14.3 Ω 20°C (68°F) 2.7 to 13.2 Ω
*a | Component without harness connected (Air Pump) |
If the result is not as specified, replace the air pump assembly.