3UR-FE Engine unit - Installation

  1. INSTALL NOISE FILTER

  2. INSTALL IGNITION COIL ASSEMBLY

  3. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH

  4. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH

  5. INSTALL CYLINDER BLOCK WATER DRAIN COCK SUB-ASSEMBLY

  6. INSTALL KNOCK SENSOR

  7. INSTALL SEPARATOR CASE

  8. INSTALL SENSOR WIRE

  9. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY

  10. INSTALL WATER INLET HOUSING

  11. INSTALL FRONT WATER BY-PASS JOINT

  12. INSTALL NO. 1 WATER BY-PASS HOSE

  13. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

  14. INSTALL NO. 1 ENGINE COVER

  15. INSTALL NO. 2 ENGINE COVER

  16. INSTALL NO. 1 FUEL TUBE

  17. INSTALL NO. 2 FUEL TUBE

  18. INSTALL INTAKE MANIFOLD

  19. INSTALL FUEL INJECTOR ASSEMBLY

  20. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY RH

  21. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY LH

  22. CONNECT NO. 1 FUEL TUBE

  23. CONNECT NO. 2 FUEL TUBE

  24. INSTALL NO. 1 FUEL HOSE

  25. INSTALL NO. 3 ENGINE COVER

  26. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  27. INSTALL ENGINE WIRE

1. INSTALL NOISE FILTER
  1. Install the 2 noise filters to the cylinder head cover with the 2 bolts.

    Torque:

    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }

2. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 8 ignition coils with the 8 bolts.

    Torque:

    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

3. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
  1. Install the mounting bracket with the 4 bolts.

    Torque:

    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

4. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
  1. Install the mounting bracket with the 4 bolts.

    Torque:

    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

5. INSTALL CYLINDER BLOCK WATER DRAIN COCK SUB-ASSEMBLY
  1. Apply adhesive to 2 or 3 threads of the drain cocks.

    Adhesive:

    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

3UR-FE Engine unit - Installation. Install the water drain cocks as shown in the illustration.

  1. Install the water drain cocks as shown in the illustration.

    Torque:

    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

    Text in Illustration
    *A LH
    *B RH
    *a Front

    NOTICE:

    1. Do not rotate the drain cocks more than 1 revolution (360°) after tightening the drain cocks to the specified torque.
    2. Do not loosen the drain cocks to adjust them. If an adjustment is necessary, remove the drain cocks and reinstall them.
  1. Install the water drain cock plugs to the water drain cocks.

    Torque:

    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

6. INSTALL KNOCK SENSOR

3UR-FE Engine unit - Installation. Install the 4 sensors with the 4 bolts so that the sensors are angled as shown in the illustration.

  1. Install the 4 sensors with the 4 bolts so that the sensors are angled as shown in the illustration.

    Torque:

    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    Text in Illustration
    *1 Bank 2 Sensor 1
    *2 Bank 1 Sensor 1
    *3 Bank 2 Sensor 2
    *4 Bank 1 Sensor 2
    *a Front
    *b Rear
    *c Top

    NOTICE:

    The acceptable installation angle of the sensor is between 10° upward and downward from the horizontal position.

7. INSTALL SEPARATOR CASE

3UR-FE Engine unit - Installation. After inserting the pipe on the rear of the separator case into the oil return pipe and the pipe on the front into the ventilation pipe, temporarily install bolt A.

  1. After inserting the pipe on the rear of the separator case into the oil return pipe and the pipe on the front into the ventilation pipe, temporarily install bolt A.

  1. Temporarily install bolt B and tighten bolt A.

    Torque:

    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the bolts labeled C.

    Torque:

    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Tighten bolt B.

    Torque:

    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    Standard Bolt:

    Item Length Thread Diameter
    Bolt A 25 mm (0.984 in.) 6 mm (0.236 in.)
    Bolt B and C 16 mm (0.630 in.) 6 mm (0.236 in.)

8. INSTALL SENSOR WIRE
  1. Connect the 3 clamps and 4 knock sensor connectors.

9. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Install the water by-pass pipe with the 2 bolts.

    Torque:

    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

10. INSTALL WATER INLET HOUSING

3UR-FE Engine unit - Installation. Install a new gasket to the timing chain cover.

  1. Install a new gasket to the timing chain cover.

  1. Install the water inlet with the 3 bolts.

    Torque:

    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Text in Illustration
    *1 Gasket

11. INSTALL FRONT WATER BY-PASS JOINT
  1. Install 2 new gaskets and the water by-pass joint with the 4 nuts.

    Torque:

    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the No. 2 water by-pass hose to the water by-pass joint.

12. INSTALL NO. 1 WATER BY-PASS HOSE
  1. Install the No. 1 water by-pass hose by connecting the hose to the water inlet housing and front water by-pass joint.

13. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Connect the 4 hoses.

  1. Install the water by-pass pipe with the 3 bolts.

    Torque:

    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

14. INSTALL NO. 1 ENGINE COVER

15. INSTALL NO. 2 ENGINE COVER

16. INSTALL NO. 1 FUEL TUBE

17. INSTALL NO. 2 FUEL TUBE
  1. Install the No. 2 fuel tube with the 2 bolts.

    Torque:

    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

18. INSTALL INTAKE MANIFOLD

3UR-FE Engine unit - Installation. Place 2 new gaskets on the intake manifold.

  1. Place 2 new gaskets on the intake manifold.

  1. Place the intake manifold on the cylinder head.

  1. Install and uniformly tighten the 8 bolts and 2 nuts in several steps.

    Torque:

    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the wire bracket to the intake manifold with the bolt.

    Torque:

    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the No. 1 ventilation hose.

  1. Connect the 2 water by-pass hoses.

  1. Connect the ventilation hose to the ventilation pipe of the cylinder head cover LH and RH.

19. INSTALL FUEL INJECTOR ASSEMBLY
  1. Attach the 3 clamps to install the No. 6 wire harness to the delivery pipe RH.

  1. Attach the 3 clamps to install the No. 7 wire harness to the delivery pipe LH.

  1. Apply gasoline or spindle oil to a new O-ring and install it to the injector.

    NOTICE:

    Make sure that there is no damage or foreign material in the groove of the injector when installing the O-ring.

3UR-FE Engine unit - Installation. Connect the injector connector.

  1. Connect the injector connector.

3UR-FE Engine unit - Installation. Install the injector to the delivery pipe as shown in the illustration.

  1. Install the injector to the delivery pipe as shown in the illustration.

    Text in Illustration
    *a CORRECT
    *b INCORRECT

    NOTICE:

    1. Make sure that there are no scratches or foreign matter in or around the insertion hole of the delivery pipe.
    2. When inserting the injector, be careful not to damage the O-ring.
    3. Attach the part of the injector labeled B between the parts of the delivery pipe labeled A.
  1. Check that each injector is installed to the delivery pipe facing the direction shown in the illustration.

    3UR-FE Engine unit - Installation. Check that each injector is installed to the delivery pipe facing the direction shown in the illustration.
    Text in Illustration
    *A Fuel Delivery Pipe RH *B Fuel Delivery Pipe LH

20. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY RH
  1. Install the 2 delivery pipe spacers and 4 insulators to the cylinder head RH.

  1. Install the delivery pipe (with injectors) to the cylinder head RH.

  1. Install the 2 bolts.

    Torque:

    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:

    3UR-FE Engine unit - Installation. Install the 2 bolts.

    Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.

    Text in Illustration
    *1 Delivery Pipe
    *2 Injector
    *a CORRECT
    *b INCORRECT
  1. Connect the No. 6 wire harness connector.

  1. Connect the ventilation hose.

21. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY LH
  1. Install the 2 delivery pipe spacers and 4 insulators to the cylinder head LH.

  1. Install the delivery pipe (with injectors) to the cylinder head LH.

  1. Install the 2 bolts.

    Torque:

    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:

    3UR-FE Engine unit - Installation.

    Make sure that the part of the injector labeled B is between the parts of the delivery pipe labeled A.

    Text in Illustration
    *1 Delivery Pipe
    *2 Injector
    *a CORRECT
    *b INCORRECT
  1. Connect the No. 7 wire harness connector.

22. CONNECT NO. 1 FUEL TUBE
  1. LH Side:

    Connect the No. 1 fuel tube to the delivery pipe LH .

  1. Connect the No. 1 fuel tube to the delivery pipe RH (for metallic type) .

23. CONNECT NO. 2 FUEL TUBE
  1. Connect the No. 2 fuel tube to the fuel pressure regulator .

24. INSTALL NO. 1 FUEL HOSE
  1. Install the fuel hose .

25. INSTALL NO. 3 ENGINE COVER

26. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

27. INSTALL ENGINE WIRE

3UR-FE Engine unit - Installation. Install the engine wire.

  1. Install the engine wire.

  1. Engine Rear Side:

    1. Install the 3 bolts as shown in the illustration.

      Torque:

      8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

    2. Connect the 5 clamps.

    3. Connect the sensor wire connector.

  1. Engine RH Side:

    1. Connect the 9 clamps.

    2. Connect the oil pressure sender gauge connector.

    3. Connect the throttle sensor connector.

    4. Connect the noise filter connector.

    5. Connect the fuel injector connector.

    6. Connect the 2 VVT sensor connectors.

      HINT:

      The wire harnesses on the exhaust side are wrapped with white tape.

    7. Connect the 4 ignition coil connectors.

    8. Connect the 2 camshaft timing control valve connectors.

      HINT:

      The wire harnesses on the exhaust side are wrapped with white tape.

  1. Engine LH Side:

    1. Connect the 7 clamps and install the engine wire with the bolt.

      Torque:

      20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    2. Connect the noise filter connector.

    3. Connect the fuel injector connector.

    4. Connect the engine coolant temperature sensor connector.

    5. Connect the purge VSV connector.

    6. Connect the vacuum switching valve connector (for ACIS).

    7. Connect the camshaft position sensor connector.

    8. Connect the 2 VVT sensor connectors.

      HINT:

      The wire harnesses on the exhaust side are wrapped with white tape.

    9. Connect the 4 ignition coil connectors.

    10. Connect the 2 camshaft timing control valve connectors.

      HINT:

      The wire harnesses on the exhaust side are wrapped with white tape.