Land Cruiser Prado GRJ150 TRJ150 TRJ155 KDJ150 TRJ155 LJ150 - СИСТЕМЫ ВПУСКА И ВЫПУСКА ОТРАБОТАВШИХ ГАЗОВ ДВИГАТЕЛЯ 5L-E
INSTALL INTAKE MANIFOLD
INSTALL INJECTION PIPE
INSTALL DIESEL THROTTLE BODY ASSEMBLY
INSTALL INTAKE FLANGE
INSTALL INTAKE PIPE
BLEED INJECTION PIPE
INSPECT FOR FUEL LEAK
ВПУСКНОЙ КОЛЛЕКТОР - УСТАНОВКА
1. INSTALL INTAKE MANIFOLD |

Install a new gasket to the cylinder head with the protrusion facing upward.
*a | Protrusion |
*b | Upward |

Install the intake manifold with the 6 bolts and 2 nuts. Uniformly tighten the bolts and nuts in several steps.
- Момент затяжки:
- 24 N*m{ 240 kgf*cm, 17 ft.*lbf}
*1 | Nut |
Install the wire harness bracket with the bolt.
- Момент затяжки:
- 13 N*m{ 131 kgf*cm, 9 ft.*lbf}
2. INSTALL INJECTION PIPE |
Install the 2 lower clamps to the intake manifold.

Using a 17 mm union nut wrench, install the 4 injection pipes.
- Момент затяжки:
- 25 N*m{ 250 kgf*cm, 18 ft.*lbf}
- ПРИМЕЧАНИЕ:
- Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page ).
Secure the injection pipes by installing the 2 upper pipe clamps and 2 nuts.
- Момент затяжки:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
3. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
Install a new gasket and the diesel throttle body.
Connect the throttle control motor connector.
Install the bracket with the 2 bolts.
- Момент затяжки:
- 13 N*m{ 131 kgf*cm, 9 ft.*lbf}
Connect the throttle open switch connector.
4. INSTALL INTAKE FLANGE |
Install a new gasket and the intake flange with the 3 nuts.
- Момент затяжки:
- 12 N*m{ 122 kgf*cm, 9 ft.*lbf}
Connect the manifold absolute pressure sensor connector.
Install the heater hose bracket with the bolt.
- Момент затяжки:
- 14 N*m{ 138 kgf*cm, 10 ft.*lbf}
Connect the PCV hose.
5. INSTALL INTAKE PIPE |
Install the intake pipe with the 2 bolts.
- Момент затяжки:
- 18 N*m{ 184 kgf*cm, 13 ft.*lbf}
Tighten the intake pipe clamp.
- Момент затяжки:
- 6.0 N*m{ 61 kgf*cm, 53 in.*lbf}
6. BLEED INJECTION PIPE |
Install the 2 lower clamps to the intake manifold.

Install the 4 injection pipes.
- Момент затяжки:
- 25 N*m{ 250 kgf*cm, 18 ft.*lbf}
*a | for Injection Nozzle Side |
*b | for Injection Pump Side |
- ПРИМЕЧАНИЕ:
- Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page ).
Install the 2 upper pipe clamps with the 2 nuts.
- Момент затяжки:
- 5.0 N*m{ 51 kgf*cm, 44 in.*lbf}
7. INSPECT FOR FUEL LEAK |
Check that there are no fuel leaks anywhere in the fuel system after performing maintenance.
- УКАЗАНИЕ:
- When checking for fuel leaks, make sure that there is pressure in the fuel line.