Lexus IS250 IS220d GSE20 ALE20 - CAN COMMUNICATION
CHECK CAN BUS LINE FOR OPEN (POWER STEERING ECU BRANCH LINE)
2AD-FHV CAN COMMUNICATION SYSTEM (for LHD) - Power Steering ECU Communication Stop Mode
DESCRIPTION
Detection Item | Symptom | Trouble Area |
Power Steering ECU Communication Stop Mode | "EPS" is not displayed on the "Communication Bus Check" screen of the intelligent tester Applies to "Power Steering ECU Communication Stop Mode" in the "DTC COMBINATION TABLE" | Power source circuit of the power steering ECU Power steering ECU branch line or connector Power steering ECU |
- HINT:
- "EPS" refers to the circuit that includes the power steering ECU.
WIRING DIAGRAM
INSPECTION PROCEDURE
1.CHECK CAN BUS LINE FOR OPEN (POWER STEERING ECU BRANCH LINE) |
Turn the engine switch off.
Disconnect the power steering ECU connector (A31).
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection Condition Specified Value A31-2 (CANH) - A31-3 (CANL) Engine switch off 54 to 69 Ω
|
| ||||
OK | |
2.CHECK WIRE HARNESS (IG, PGND) |
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection Condition Specified Value A31-5 (PGND) - Body ground Always Below 1 Ω
Measure the voltage according to the value(s) in the table below.
- Standard voltage:
Tester Connection Condition Specified Value A31-9 (IG) - Body ground Engine switch on (IG) 10 to 14 V
|
| ||||
OK | ||
|
LEXUS IS250, IS220d / GSE20 ALE20