Lexus IS250 IS220d GSE20 ALE20 - BRAKE CONTROL
SKID CONTROL BUZZER - INSTALLATION
1. INSTALL SKID CONTROL BUZZER ASSEMBLY |

Attach the claw and install the skid control buzzer assembly.
Connect the skid control buzzer assembly connector.
2. INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY |

Connect the connector.
- NOTICE:
- When handling the airbag connector, take care not to damage the airbag wire harness.
Install the driver side knee airbag assembly with the 4 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm, 7 ft.*lbf}
3. INSTALL LOWER INSTRUMENT FINISH PANEL SUB-ASSEMBLY |

Connect the connectors.
Engage the 7 clips and install the lower instrument panel finish panel sub-assembly.
4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY |

Connect the connectors.
Insert the No. 1 instrument panel under cover sub-assembly into the guide as shown in the illustration.
Engage the 2 claws.
Install the No. 1 instrument panel under cover sub-assembly with the 2 screws <E-.
5. INSTALL SIDE INSTRUMENT PANEL LH |

Engage the 5 claws and 3 clips, and then install the side instrument panel LH.
6. CONNECT BATTERY NEGATIVE TERMINAL |
- Torque:
- 5.4 N*m{ 55 kgf*cm, 48 in.*lbf}
7. INSPECT SRS WARNING LIGHT |
- HINT:
- .
8. PERFORM INITIALIZATION |
- HINT:
- .
Some system need initialization after reconnecting the cable to the negative battery cable.