Lexus IS250 IS220d GSE20 ALE20 - METER

DESCRIPTION

WIRING DIAGRAM

INSPECTION PROCEDURE

INSPECT COMBINATION METER ASSEMBLY

METER / GAUGE SYSTEM - Entire Combination Meter does not Operate

DESCRIPTION

This circuit is the power source circuit for the meter.
This circuit provides two types of power sources; one is a constant power source mainly used as a backup power source, and the other is a power source mainly used for signal transmission. The constant power source is mainly used as a backup power source of the meter CPU, however, it is also used for communication.
If a voltage of 12 V is not applied to terminal IG+ when the engine switch is on (IG), the indicator will not operate.

WIRING DIAGRAM

Meter / Gauge System - Entire Combination Meter Does Not Operate. METER. Lexus IS250 IS220d GSE20 ALE20

INSPECTION PROCEDURE

1.INSPECT COMBINATION METER ASSEMBLY
Meter / Gauge System - Entire Combination Meter Does Not Operate. METER. Lexus IS250 IS220d GSE20 ALE20

Disconnect the J34 connector.

Measure the resistance according to the value(s) in the table below.

  • Standard resistance:
  • Tester ConnectionConditionSpecified Condition
    J34-1 (E2) -
    Body ground
    AlwaysBelow 1 Ω
    C34-13 (ES) -
    Body ground
    AlwaysBelow 1 Ω

Measure the voltage according to the value(s) in the table below.

  • Standard voltage:
  • Tester ConnectionConditionSpecified Condition
    J34-12 (IG+) -
    Body ground
    Engine switch on (IG)10 to 14V
    J34-23 (B) -
    Body ground
    Always10 to 14 V
    J34-24 (B) -
    Body ground
    Always10 to 14 V
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
REPLACE COMBINATION METER ASSEMBLY
LEXUS IS250, IS220d / GSE20 ALE20