Lexus IS250 IS220d GSE20 ALE20 - HORN
LOW PITCHED HORN - INSTALLATION
1. INSTALL LOW PITCHED HORN |

Install the low pitched horn with the bolt.
- Torque:
- 19 N*m{ 194 kgf*cm, 14 ft.*lbf}
Connect the connector.
2. INSTALL COOL AIR INTAKE DUCT SEAL |

Install the intake duct seal with the 11 clips.