Lexus IS250 IS220d GSE20 ALE20 - HORN
LOW PITCHED HORN - INSTALLATION
1. INSTALL LOW PITCHED HORN |
Install the low pitched horn with the bolt.
- Torque:
- 19 N*m{ 194 kgf*cm, 14 ft.*lbf}
Connect the connector.
2. INSTALL COOL AIR INTAKE DUCT SEAL |
Install the intake duct seal with the 11 clips.
LEXUS IS250, IS220d / GSE20 ALE20