Lexus IS250 IS220d GSE20 ALE20 2AD-FHV ENGINE CONTROL SYSTEM
ECM - INSTALLATION
1. CONNECT ECM CONNECTOR |
Connect the 2 ECM connectors.
- NOTICE:
- When connecting the connector, make sure that dirt, water and other foreign matter do not become stuck between the connector and other parts.

Connect the 2 ECM connectors and lower the 2 levers.
- NOTICE:
- Make sure that the 2 levers are securely lowered.
2. INSTALL ECM |

Install the ECM with the 2 bolts and nut.
- Torque:
- 8.0 N*m{ 81 kgf*cm, 71 in.*lbf}
3. REMOVE ENGINE ROOM SIDE COVER LH |

Install the side cover with the 4 clips.
4. REMOVE COOL AIR INTAKE DUCT SEAL |

Install the intake duct seal with the 11 clips.
LEXUS IS250, IS220d / GSE20 ALE20