Ecd System - Engine Does Not Start Even After Priming
Lexus IS250 IS220d GSE20 ALE20 2AD-FHV ENGINE CONTROL SYSTEM
INSPECTION PROCEDURE
CHECK FUEL LEVEL
CHECK SATELLITE SWITCH OPERATION
PERFORM ACTIVE TEST BY INTELLIGENT TESTER (OPERATE F/PMP RELAY)
ECD SYSTEM - Engine does not Start even after Priming
INSPECTION PROCEDURE
Check the fuel gauge to confirm the fuel level.
- Result:
Condition | Proceed to |
Full | A |
Less than half | B |
Empty | C |
| GO TO FUEL PUMP CONTROL CIRCUIT |
|
|
2.CHECK SATELLITE SWITCH OPERATION |
Operate the satellite switch to select PRIMING operation.
Operate the satellite switch to turn ON or OFF priming operation.
- OK:
- PRIMING is shown in the combination meter, and priming operation can be turned ON or OFF.
| GO TO SATELLITE SWITCH CIRCUIT |
|
|
3.PERFORM ACTIVE TEST BY INTELLIGENT TESTER (OPERATE F/PMP RELAY) |
Connect the intelligent tester to the DLC3.
Turn the engine switch ON (IG) and turn the intelligent tester ON.
Enter the following menus: Powertrain / Engine / Active Test / Active the Intank Fuel Pump Relay.
Check the operation of the fuel pump while operating it using the intelligent tester.
- OK:
- Operating noise can be heard from the fuel pump.
Grip the fuel hose to confirm that fuel is being transferred when priming operation is performed.
- OK:
- Fuel is being transferred.
| GO TO FUEL PUMP CONTROL CIRCUIT |
|
|
OK | |
| |
REPLACE FUEL ROUTE SWITCHING VALVE |
|
LEXUS IS250, IS220d / GSE20 ALE20