Dtc P144C Open In Secondary Air Injection System Heater Control Circuit
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
INSPECT NO. 2 INTEGRATION RELAY (AIR PMP HTR)
CHECK NO. 2 INTEGRATION RELAY (AIR PMP HTR) (POWER SOURCE)
CHECK HARNESS AND CONNECTOR (ECM - NO. 2 INTEGRATION RELAY (AIR PMP HTR))
DTC P144C Open in Secondary Air Injection System Heater Control Circuit |
DTC P144D Short in Secondary Air Injection System Heater Control Circuit |
DESCRIPTION
The ECM operates the air pump heater relay (AIR PMP HTR) which causes the air pump heater to operate.DTC No.
| DTC Detection Condition
| Trouble Area
|
P144C
| Open or short in the air pump heater relay circuit for 5 seconds (1 trip detection logic).
| - Open or short in air pump heater relay circuit
- No. 2 Integration Relay (AIR PMP HTR)
- ECM
|
P144D
| Open or short in the air pump heater relay circuit for 5 seconds (1 trip detection logic).
| - Open or short in air pump heater relay circuit
- No. 2 Integration Relay (AIR PMP HTR)
- ECM
|
WIRING DIAGRAM
Refer to DTC P0412 (Click here).
INSPECTION PROCEDURE
- NOTICE:
- Inspect the fuses of circuits related to this system before performing the following inspection procedure.
- HINT:
- Read freeze frame data using the GTS. Freeze frame data records the engine condition when malfunctions are detected. When troubleshooting, freeze frame data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, if the air-fuel ratio was lean or rich, and other data from the time the malfunction occurred.
1.INSPECT NO. 2 INTEGRATION RELAY (AIR PMP HTR) |
Inspect the No. 2 integration relay (AIR PMP HTR) (Click here).
| REPLACE AIR PUMP HEATER RELAY (AIR PMP HTR) |
|
|
2.CHECK NO. 2 INTEGRATION RELAY (AIR PMP HTR) (POWER SOURCE) |
Remove the No. 2 integration relay (AIR PMP HTR).
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
for RHDTester Connection
| Condition
| Specified Condition
|
1X-1 - Body ground
| Always
| 11 to 14 V
|
for LHDTester Connection
| Condition
| Specified Condition
|
1Y-1 - Body ground
| Always
| 11 to 14 V
|
Reinstall the No. 2 integration relay (AIR PMP HTR).
| REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 2
INTEGRATION RELAY) |
|
|
3.CHECK HARNESS AND CONNECTOR (ECM - NO. 2 INTEGRATION RELAY (AIR PMP HTR)) |
Remove the No. 2 integration relay (AIR PMP HTR).
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
for RHDTester Connection
| Condition
| Specified Condition
|
1P-10 - C46-60 (HAI1)
| Always
| Below 1 Ω
|
1P-10 or C46-60 (HAI1) - Body ground
| Always
| 10 kΩ or higher
|
for LHDTester Connection
| Condition
| Specified Condition
|
1P-10 - C45-60 (HAI1)
| Always
| Below 1 Ω
|
1P-10 or C45-60 (HAI1) - Body ground
| Always
| 10 kΩ or higher
|
Reinstall the No. 2 integration relay (AIR PMP HTR).
Reconnect the ECM connector.