Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Ur-Fe Emission Control. Land Cruiser. Urj200, 202 Grj200 Vdj200
Air Switching Valve (For Bank 2) -- Installation |
1. INSTALL AIR SWITCHING VALVE ASSEMBLY |
Install a new gasket and the air switching valve with the 3 bolts.
- Torque:
- 24 N*m{245 kgf*cm, 18 ft.*lbf}
Text in Illustration *1 Air Switching Valve *2 Claw *3 No. 3 Air Tube - NOTICE:
- Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.
![]() |
Install the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Attach the wire harness clamp and connect the air switching valve connector.
2. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE |
Align the paint mark with the projection and connect the No. 1 air injection system hose.
Text in Illustration *1 Protrusion *2 Paint Mark - HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
![]() |
3. CONNECT NO. 3 PCV HOSE |
Connect the No. 3 PCV hose.
4. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose, and then tighten the hose clamp.
- Torque:
- 2.5 N*m{25 kgf*cm, 22 in.*lbf}
Attach the 4 clamps.
Connect the mass air flow meter connector and attach the clamp.
Connect the No. 2 PCV hose and No. 1 air hose.
5. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
Text in Illustration *1 Grommet *2 Pin *3 Hook *4 Bracket
![]() |