Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Ur-Fe Emission Control. Land Cruiser. Urj200, 202 Grj200 Vdj200
Air Switching Valve (For Bank 1) -- Installation |
1. INSTALL AIR SWITCHING VALVE ASSEMBLY |
Install a new gasket and the air switching valve with the 3 bolts.
- Torque:
- 24 N*m{245 kgf*cm, 18 ft.*lbf}
Text in Illustration *1 No. 4 Air Tube *2 Claw *3 Air Switching Valve - NOTICE:
- Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.
![]() |
Install the 2 bolts.
- Torque:
- 10 N*m{102 kgf*cm, 7 ft.*lbf}
Connect the wire harness clamp bracket with the bolt.
- Torque:
- 8.0 N*m{82 kgf*cm, 71 in.*lbf}
2. CONNECT NO. 2 AIR INJECTION SYSTEM HOSE |
Connect the No. 2 air injection system hose.
Text in Illustration *1 Protrusion *2 Paint Mark - HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
![]() |
Connect the connector.
3. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
Text in Illustration *1 Grommet *2 Pin *3 Hook *4 Bracket
![]() |