Air Switching Valve (For Bank 2) Installation

Engine Hybrid System. Land Cruiser. Urj200, 202 Grj200 Vdj200
1Gr-Fe Emission Control. Land Cruiser. Urj200, 202 Grj200 Vdj200

  1. INSTALL NO. 2 EMISSION CONTROL VALVE SET

  2. INSTALL NO. 2 AIR TUBE

  3. INSTALL PURGE VSV

Air Switching Valve (For Bank 2) -- Installation



1. INSTALL NO. 2 EMISSION CONTROL VALVE SET
  1. Install the No. 2 emission control valve set with the 3 nuts.

    Torque:
    21 N*m{214 kgf*cm, 15 ft.*lbf}


    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Gr-Fe Emission Control.Emission Control System (W/ Secondary Air Injection System).Air Switching Valve (For Bank 2)  Installation
  1. Align the paint mark with the rib and connect the No. 1 air hose.

    Text in Illustration
    *1
    Paint Mark
    *2
    Rib
    *a
    Top
    *b
    LH Side
    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.
  1. Connect the No. 2 emission control valve set connector.



2. INSTALL NO. 2 AIR TUBE


    Land Cruiser. Urj200, 202 Grj200 Vdj200.1Gr-Fe Emission Control.Emission Control System (W/ Secondary Air Injection System).Air Switching Valve (For Bank 2)  Installation
  1. Install 2 new gaskets.

    Text in Illustration
    *1
    Claw
    *2
    No. 2 Air Tube
    NOTICE:
    Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.
  1. Install the No. 2 air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{102 kgf*cm, 7 ft.*lbf}


3. INSTALL PURGE VSV
  1. Install the purge VSV (Click here).