Air Conditioning System (For Automatic Air Conditioning System) Cooling Box Control Switch Circuit
DESCRIPTION
WIRING DIAGRAM
INSPECTION PROCEDURE
INSPECT FUSE (PANEL, A/C IG, ECU-B1)
CHECK HARNESS AND CONNECTOR (NO. 1 COOLER WIRING HARNESS - BATTERY)
CHECK HARNESS AND CONNECTOR (NO. 1 COOLER WIRING HARNESS - BODY GROUND)
CHECK NO. 1 COOLER WIRING HARNESS SUB-ASSEMBLY (OPERATION)
INSPECT COOLER CONTROL SWITCH SUB-ASSEMBLY
AIR CONDITIONING SYSTEM (for Automatic Air Conditioning System) - Cooling Box Control Switch Circuit |
DESCRIPTION
The cooler control switch is the activation switch for the cooling box. If the cooling box does not activate when the cooler control switch is pushed, there may be a malfunction in the circuit shown below.
WIRING DIAGRAM
INSPECTION PROCEDURE
1.INSPECT FUSE (PANEL, A/C IG, ECU-B1) |
Remove the PANEL and A/C IG fuses from the cowl side junction block LH.
Remove the ECU-B1 fuse from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
PANEL fuse
| Always
| Below 1 Ω
|
ECU-B1 fuse
| Always
| Below 1 Ω
|
A/C IG fuse
| Always
| Below 1 Ω
|
2.CHECK HARNESS AND CONNECTOR (NO. 1 COOLER WIRING HARNESS - BATTERY) |
Disconnect the No. 1 cooler wiring harness sub-assembly connector.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
| Condition
| Specified Condition
|
4 (+B) - Body ground
| Always
| 11 to 14 V
|
1 (B) - Body ground
| Engine switch off
| Below 1 V
|
Engine switch on (IG)
| 11 to 14 V
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
3.CHECK HARNESS AND CONNECTOR (NO. 1 COOLER WIRING HARNESS - BODY GROUND) |
Disconnect the No. 1 cooler wiring harness sub-assembly connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Condition
| Specified Condition
|
6 (L) - Body ground
| Always
| Below 1 Ω
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
4.CHECK NO. 1 COOLER WIRING HARNESS SUB-ASSEMBLY (OPERATION) |
Replace the No. 1 cooler wiring harness sub-assembly with a normal one and check that the condition returns to normal.
- OK:
- Same problem does not occur.
OK |
|
|
|
REPLACE NO. 1 COOLER WIRING HARNESS SUB-ASSEMBLY |
|
5.INSPECT COOLER CONTROL SWITCH SUB-ASSEMBLY |
Remove the cooler control switch sub-assembly (Click here).
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
| Switch Condition
| Specified Condition
|
1 - 2
| On
| Below 1 Ω
|
1 - 2
| Off
| 10 kΩ or higher
|
Apply battery voltage to the cooler control switch connector and check that the cooler control switch illuminates.
- OK:
Measurement Condition
| Specified Condition
|
Battery positive (+) → Terminal 3 Battery negative (-) → Terminal 4
| LED illuminates
|
Battery positive (+) → Terminal 5 Battery negative (-) → Terminal 6
| LED illuminates
|
| REPLACE COOLER CONTROL SWITCH SUB-ASSEMBLY (Click here) |
|
|
OK |
|
|
|
REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY (for Cool Box) (Click here) |
|