REMOVE NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
REMOVE NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
Ignition Coil And Spark Plug -- Removal |
1. REMOVE V-BANK COVER |
Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
Text in Illustration *1 Pin *2 Hook
![]() |
2. REMOVE AIR CLEANER CAP AND HOSE |
Remove the air cleaner cap and hose.
Disconnect the mass air flow meter connector, vacuum hose and No. 2 PCV hose and detach the clamp.
Loosen the clamp.
Unfasten the 4 hook clamps, and then remove the bolt and the air cleaner cap and hose.
3. REMOVE AIR CLEANER CASE SUB-ASSEMBLY |
Remove the air cleaner filter element.
Remove the 3 bolts and air cleaner case.
![]() |
4. REMOVE AIR TUBE (w/ Secondary Air Injection System) |
Remove the 2 bolts, 2 nuts and air tube.
![]() |
Remove the 2 gaskets.
- NOTICE:
- Be careful not to damage the installation surface of the gaskets.
5. REMOVE NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System) |
Disconnect the No. 1 emission control valve set connector.
![]() |
Disconnect the No. 1 air hose from the No. 1 emission control valve set.
Remove the 3 nuts and No. 1 emission control valve set.
![]() |
6. REMOVE NO. 2 AIR TUBE (w/ Secondary Air Injection System) |
Remove the 2 bolts, 2 nuts and No. 2 air tube.
![]() |
Remove the 2 gaskets.
- NOTICE:
- Be careful not to damage the installation surface of the gaskets.
7. REMOVE NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System) |
Disconnect the No. 2 emission control valve set connector.
![]() |
Disconnect the No. 3 air hose.
Remove the 3 nuts and No. 2 emission control valve set.
![]() |
8. REMOVE IGNITION COIL ASSEMBLY |
Disconnect the 6 ignition coil connectors.
Text in Illustration *A Bank 1 *B Bank 2
![]() |
Remove the 6 bolts and 6 ignition coils.
9. REMOVE SPARK PLUG |
Remove the 6 spark plugs.